ITAC Assessment: OK0355
ITAC logo
ITAC Assessment: OK0355
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1991
Principal Product TRUCKS
NAICS
n/a
SIC 3533: Oil and Gas Field Machinery and Equipment
Sales Range $10
M
to 50
M
# of Employees 315
Plant Area
n/a
Annual Production 450
pieces
Production Hrs. Annual 2,600
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $285,089 4,793,963
kWh
Natural Gas $54,451 18,351
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $34,312 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $34,312

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.7123: Keep lamps and reflectors clean $2,630 - $2,477
41,618
kWh
- $153
02 2.4111: Utilize energy-efficient belts and other improved mechanisms $517 $1,555 $517
8,792
kWh
- -
03 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $4,136 $9,186 $4,136
69,461
kWh
- -
04 2.7261: Install timers and/or thermostats $3,475 $1,745 - $3,475
-
MMBtu
-
05 2.7261: Install timers and/or thermostats $1,411 $1,150 $663
11,137
kWh
$748
-
MMBtu
-
06 2.6232: Install set-back timers $7,481 $3,386 $7,481
125,733
kWh
- -
07 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $4,405 - $4,705
79,132
kWh
- $(-300.0)
08 2.7447: Install vinyl strip / high speed / air curtain doors $10,257 $50,625 $(-1,677.0)
(-28,136)
kWh
$11,934
-
MMBtu
-
TOTAL RECOMMENDED $34,312 $67,647 $18,302
307,737
kWh
$16,157
-
MMBtu
$(-147.0)
TOTAL IMPLEMENTED $34,312 $67,647 $18,302
307,737
kWh
$16,157
-
MMBtu
$(-147.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs