ITAC Assessment: OK0341
ITAC logo
ITAC Assessment: OK0341
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1991
Principal Product VINYL FLOOR COVERING
NAICS
n/a
SIC 3996: Linoleum, Asphalted-Felt-Base, and Other Hard Surface Floor Coverings, Not Elsewhere Classified
Sales Range $50
M
to 100
M
# of Employees 200
Plant Area
n/a
Annual Production 154
thousand feet
Production Hrs. Annual 4,000
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $579,310 13,649,180
kWh
Natural Gas $328,854 151,090
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $69,730 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $69,730

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7261: Install timers and/or thermostats $355 $245 $145
4,103
kWh
$210
-
MMBtu
02 2.4111: Utilize energy-efficient belts and other improved mechanisms $4,004 $6,200 $4,004
77,374
kWh
-
03 2.7142: Utilize higher efficiency lamps and/or ballasts $1,241 $791 $1,241
25,205
kWh
-
04 2.7141: Lower light fixtures in high ceiling areas $14,080 $38,500 $14,080
394,490
kWh
-
05 2.7261: Install timers and/or thermostats $1,481 $1,800 - $1,481
-
MMBtu
06 2.6232: Install set-back timers $19,001 $13,510 $19,001
535,170
kWh
-
07 2.7142: Utilize higher efficiency lamps and/or ballasts $846 $1,336 $846
12,896
kWh
-
08 2.2135: Repair and eliminate steam leaks $443 $740 - $443
-
MMBtu
09 2.4221: Install compressor air intakes in coolest locations $2,226 $2,900 $444
12,309
kWh
$1,782
-
MMBtu
10 2.2414: Use waste heat from hot flue gases to preheat $26,053 $16,500 $(-1,079.0)
(-19,343)
kWh
$27,132
-
MMBtu
TOTAL RECOMMENDED $69,730 $82,522 $38,682
1,042,204
kWh
$31,048
-
MMBtu
TOTAL IMPLEMENTED $69,730 $82,522 $38,682
1,042,204
kWh
$31,048
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs