ITAC Assessment: OK0249
ITAC logo
ITAC Assessment: OK0249
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1988
Principal Product METAL FABRICATIONS
NAICS
n/a
SIC 3498: Fabricated Pipe and Pipe Fittings
Sales Range $10
M
to 50
M
# of Employees 85
Plant Area
n/a
Annual Production 200
pieces
Production Hrs. Annual 2,016
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $43,324 860,785
kWh
Natural Gas $16,057 3,612
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $5,931 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $4,871

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.4231: Reduce the pressure of compressed air to the minimum required $956 - $956
16,120
kWh
- -
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,980 - $3,320
55,979
kWh
- $(-340.0)
03 2.7261: Install timers and/or thermostats $1,682 $1,800 - $1,682
-
MMBtu
-
04 2.7142: Utilize higher efficiency lamps and/or ballasts $209 $490 $209
3,517
kWh
- -
05 2.6232: Install set-back timers $104 - $104
1,758
kWh
- -
TOTAL RECOMMENDED $5,931 $2,290 $4,589
77,374
kWh
$1,682
-
MMBtu
$(-340.0)
TOTAL IMPLEMENTED $4,871 $2,290 $3,529
59,496
kWh
$1,682
-
MMBtu
$(-340.0)
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs