Assessment Year | 2014 |
---|---|
Principal Product | Commercial wood doors |
NAICS | 321911: Wood Window and Door Manufacturing |
SIC | 2431: Millwork |
Sales Range | $10 M to 50M |
# of Employees | 250 |
Plant Area |
275,119
ft2
|
Annual Production | 173,601
pieces
|
Production Hrs. Annual | 6,240
hrs
|
Location (State) | Wisconsin |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $543,106 | 7,639,400 |
kWh
|
$0.071 |
Electricity Demand | $258,540 | 19,637 |
kW-mo/yr
|
$13.17 |
Electricity Fees | $32,352 | - |
|
- |
Natural Gas | $156,156 | 30,330 |
MMBtu
|
$5.15 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $248,004 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $34,656 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Personnel Changes Savings | One-time Revenue or Avoided Cost Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.5194: Redesign process | $84,202 | $409,525 |
$36,675
516,547
kWh
|
$17,933
-
kW-mo/yr
|
- | $29,594 | - | |
02 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $10,079 | - |
$5,958
83,916
kWh
|
- | $4,121 | - | - | |
03 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $30,995 | $44,750 |
$30,995
436,543
kWh
|
- | - | - | - | |
04 | 2.3137: Use power during off-peak periods | $1,567 | - | - | - | $1,567 | - | - | |
05 | 3.4116: Meter recycled water (to reduce sewer charges) | $1,012 | $2,000 | - | - | - | - | $1,012 | |
06 | 2.7135: Install occupancy sensors | $940 | $760 |
$940
13,234
kWh
|
- | - | - | - | |
07 | 2.7111: Reduce illumination to minimum necessary levels | $12,676 | $9,434 |
$10,201
143,670
kWh
|
$2,475
-
kW-mo/yr
|
- | - | - | |
08 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,292 | $5,348 |
$1,689
23,793
kWh
|
$603
-
kW-mo/yr
|
- | - | - | |
09 | 2.4226: Use / purchase optimum sized compressor | $13,969 | $41,765 |
$6,241
87,907
kWh
|
$7,728
-
kW-mo/yr
|
- | - | - | |
10 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $4,788 | $1,290 |
$3,161
44,518
kWh
|
$1,627
-
kW-mo/yr
|
- | - | - | |
11 | 2.4221: Install compressor air intakes in coolest locations | $4,253 | $3,096 |
$3,162
44,532
kWh
|
$1,091
-
kW-mo/yr
|
- | - | - | |
12 | 2.8114: Change rate schedules or other changes in utility service | $81,231 | $200,000 | - | - | $81,231 | - | - | |
TOTAL RECOMMENDED | $248,004 | $717,968 |
$99,022
1,394,660
kWh
|
$31,457
-
kW-mo/yr
|
$86,919 | $29,594 | $1,012 | ||
TOTAL IMPLEMENTED | $34,656 | $46,151 |
$18,522
260,873
kWh
|
$10,446
-
kW-mo/yr
|
$5,688 | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Personnel Changes Savings | One-time Revenue or Avoided Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs