ITAC Assessment: LE0587
ITAC logo
ITAC Assessment: LE0587
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2025
Principal Product EV Stations
NAICS 332812: Metal Coating, Engraving (except Jewelry and Silverware), and Allied Services to Manufacturers
SIC 3479: Coating, Engraving, and Allied Services, Not Elsewhere Classified
Sales Range $50
M
to 100
M
# of Employees 150
Plant Area 60,000
ft2
Annual Production 200
units
Production Hrs. Annual 2,080
hrs
Location (State) New Jersey

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $55,950 447,601
kWh
Electricity Demand $13,549 1,568
kW-mo/yr
Electricity Fees $3,520 -
Natural Gas $26,446 25,527
MMBtu
TOTAL YEARLY COSTS $99,465
RECOMMENDED SAVINGS* $79,061 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.4231: Reduce the pressure of compressed air to the minimum required $2,438 - $2,153
17,222
kWh
$285
-
kW-mo/yr
-
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $10,795 $1,400 $9,528
76,225
kWh
$1,267
-
kW-mo/yr
-
03 2.9114: Use solar heat to make electricty $58,495 $104,135 $58,495
178,698
kWh
- -
04 2.4221: Install compressor air intakes in coolest locations $667 $2,000 $624
4,992
kWh
$43
-
kW-mo/yr
-
05 2.7232: Replace existing hvac unit with high efficiency model $1,851 $6,801 $1,747
13,978
kWh
$104
-
kW-mo/yr
-
06 2.2442: Preheat combustion air with waste heat $4,080 $15,000 $(-970.0)
(-7,758)
kWh
$(-389.0)
-
kW-mo/yr
$5,439
-
MMBtu
07 2.7142: Utilize higher efficiency lamps and/or ballasts $735 $2,997 $588
4,705
kWh
$147
-
kW-mo/yr
-
TOTAL RECOMMENDED $79,061 $132,333 $72,165
288,062
kWh
$1,457
-
kW-mo/yr
$5,439
-
MMBtu
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs