Assessment Year | 1985 |
---|---|
Principal Product | AIR CONDITIONING UNITS |
NAICS |
n/a
|
SIC | 3585: Air-Conditioning and Warm Air Heating Equipment and Commercial and Industrial Refrigeration Equipment |
Sales Range | $5 M to 10M |
# of Employees | 550 |
Plant Area |
n/a
|
Annual Production | 4,000
pieces
|
Production Hrs. Annual | 4,400
hrs
|
Location (State) | Oklahoma |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $775,141 | 18,492,966 |
kWh
|
$0.042 |
Natural Gas | $207,334 | 57,021 |
MMBtu
|
$3.64 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $80,879 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $49,143 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|
01 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $9,330 | $292 |
$9,330
-
kWh
|
- | - | |
02 | 2.1233: Analyze flue gas for proper air/fuel ratio | $3,030 | $1,500 | - |
$3,030
-
MMBtu
|
- | |
03 | 2.2511: Insulate bare equipment | $231 | $842 | - |
$231
-
MMBtu
|
- | |
04 | 2.1131: Repair faulty insulation in furnaces, boilers, etc | $245 | $228 | - |
$245
-
MMBtu
|
- | |
05 | 2.2511: Insulate bare equipment | $62 | $120 | - |
$62
-
MMBtu
|
- | |
06 | 2.2511: Insulate bare equipment | $4,930 | $4,780 | - |
$4,930
-
MMBtu
|
- | |
07 | 2.6232: Install set-back timers | $2,001 | $222 |
$2,001
47,479
kWh
|
- | - | |
08 | 2.4221: Install compressor air intakes in coolest locations | $860 | $631 |
$860
26,964
kWh
|
- | - | |
09 | 3.5314: Use in-process recycling whenever possible | $29,355 | $6,000 |
$284
6,155
kWh
|
- | $29,071 | |
10 | 3.6124: Burn waste oil for heat | $2,381 | - |
$(-72.0)
(-1,465)
kWh
|
$1,454
-
MMBtu
|
$999 | |
11 | 2.7261: Install timers and/or thermostats | $23,457 | $1,100 | - |
$23,457
-
MMBtu
|
- | |
12 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $4,997 | $8,550 |
$3,987
94,666
kWh
|
- | $1,010 | |
TOTAL RECOMMENDED | $80,879 | $24,265 |
$16,390
173,799
kWh
|
$33,409
-
MMBtu
|
$31,080 | ||
TOTAL IMPLEMENTED | $49,143 | $18,265 |
$16,178
169,109
kWh
|
$31,955
-
MMBtu
|
$1,010 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs