ITAC Assessment: OK0169
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1985
Principal Product AIR CONDITIONING UNITS
NAICS
n/a
SIC 3585: Air-Conditioning and Warm Air Heating Equipment and Commercial and Industrial Refrigeration Equipment
Sales Range $5
M
to 10
M
# of Employees 550
Plant Area
n/a
Annual Production 4,000
pieces
Production Hrs. Annual 4,400
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $775,141 18,492,966
kWh
Natural Gas $207,334 57,021
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $80,879 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $49,143

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.3131: Reschedule plant operations or reduce load to avoid peaks $9,330 $292 $9,330
-
kWh
- -
02 2.1233: Analyze flue gas for proper air/fuel ratio $3,030 $1,500 - $3,030
-
MMBtu
-
03 2.2511: Insulate bare equipment $231 $842 - $231
-
MMBtu
-
04 2.1131: Repair faulty insulation in furnaces, boilers, etc $245 $228 - $245
-
MMBtu
-
05 2.2511: Insulate bare equipment $62 $120 - $62
-
MMBtu
-
06 2.2511: Insulate bare equipment $4,930 $4,780 - $4,930
-
MMBtu
-
07 2.6232: Install set-back timers $2,001 $222 $2,001
47,479
kWh
- -
08 2.4221: Install compressor air intakes in coolest locations $860 $631 $860
26,964
kWh
- -
09 3.5314: Use in-process recycling whenever possible $29,355 $6,000 $284
6,155
kWh
- $29,071
10 3.6124: Burn waste oil for heat $2,381 - $(-72.0)
(-1,465)
kWh
$1,454
-
MMBtu
$999
11 2.7261: Install timers and/or thermostats $23,457 $1,100 - $23,457
-
MMBtu
-
12 2.7142: Utilize higher efficiency lamps and/or ballasts $4,997 $8,550 $3,987
94,666
kWh
- $1,010
TOTAL RECOMMENDED $80,879 $24,265 $16,390
173,799
kWh
$33,409
-
MMBtu
$31,080
TOTAL IMPLEMENTED $49,143 $18,265 $16,178
169,109
kWh
$31,955
-
MMBtu
$1,010
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs