ITAC Assessment: GT0676
ITAC logo
ITAC Assessment: GT0676
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1999
Principal Product Glass Panels
NAICS
n/a
SIC 3211: Flat Glass
Sales Range $1
M
to 5
M
# of Employees 27
Plant Area 140,000
ft2
Annual Production 780,750
thousand feet
Production Hrs. Annual 2,000
hrs
Location (State) Georgia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $31,221 1,282,825
kWh
Electricity Demand $25,436 2,013
kW-mo/yr
Electricity Fees $3,616 -
Natural Gas $295,343 91,179
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $115,130 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $11,148

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Water Disposal Savings Solid Waste (non-haz) Savings Administrative Changes Savings Ancillary Material Cost Savings Increase in Production Savings
01 3.4156: Use flow control valves on equipment to optimize water use $3,081 $500 - - $1,337
-
Tgal
- - $1,744 -
02 3.5311: Recover and reuse waste material $11,148 - - - - $11,148
-
lb
- - -
03 2.2414: Use waste heat from hot flue gases to preheat $29,047 $12,000 - $29,047
-
MMBtu
- - - - -
04 2.2531: Re-size charging openings or add movable cover or door $20,293 $15,000 - $20,293
-
MMBtu
- - - - -
05 4.424: Improve space comfort conditioning $33,650 $18,000 - - - - - - $33,650
06 2.8112: Combine utility meters $292 - - - - - $292 - -
07 3.4156: Use flow control valves on equipment to optimize water use $1,295 $100 - - $945
-
Tgal
- - $350 -
08 3.1191: Change procedures / equipment / operating conditions $16,324 $35,000 $2,507
78,253
kWh
- $5,103
-
Tgal
- - $8,714 -
TOTAL RECOMMENDED $115,130 $80,600 $2,507
78,253
kWh
$49,340
-
MMBtu
$7,385
-
Tgal
$11,148
-
lb
$292 $10,808 $33,650
TOTAL IMPLEMENTED $11,148 - - - - $11,148
-
lb
- - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Water Disposal Savings Solid Waste (non-haz) Savings Administrative Changes Savings Ancillary Material Cost Savings Increase in Production Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs