Assessment Year | 1988 |
---|---|
Principal Product | BATHROOM SCALES |
NAICS |
n/a
|
SIC | 3596: Scales and Balances, Except Laboratory |
Sales Range | $10 M to 50M |
# of Employees | 250 |
Plant Area |
n/a
|
Annual Production | 2,000,000
pieces
|
Production Hrs. Annual | 4,250
hrs
|
Location (State) | Illinois |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $179,044 | 1,944,607 |
kWh
|
$0.092 |
Natural Gas | $81,519 | 24,289 |
MMBtu
|
$3.36 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $23,946 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|
01 | 2.4312: Improve lubrication practices | $3,262 | - |
$3,262
35,463
kWh
|
- | - | |
02 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $850 | - |
$850
9,379
kWh
|
- | - | |
03 | 2.6232: Install set-back timers | $2,537 | $331 |
$2,537
27,550
kWh
|
- | - | |
04 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $3,816 | $5,000 |
$3,816
-
kWh
|
- | - | |
05 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $3,192 | $1,500 |
$3,780
41,032
kWh
|
$(-588.0)
-
MMBtu
|
- | |
06 | 2.7447: Install vinyl strip / high speed / air curtain doors | $930 | $1,400 | - |
$930
-
MMBtu
|
- | |
07 | 2.1233: Analyze flue gas for proper air/fuel ratio | $2,208 | $250 | - |
$2,358
-
MMBtu
|
$(-150.0) | |
08 | 2.1233: Analyze flue gas for proper air/fuel ratio | $80 | $250 | - |
$230
-
MMBtu
|
$(-150.0) | |
09 | 2.2414: Use waste heat from hot flue gases to preheat | $7,071 | $10,000 | - |
$7,071
-
MMBtu
|
- | |
TOTAL RECOMMENDED | $23,946 | $18,731 |
$14,245
113,424
kWh
|
$10,001
-
MMBtu
|
$(-300.0) | ||
TOTAL IMPLEMENTED | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs