ITAC Assessment: OK0163
ITAC logo
ITAC Assessment: OK0163
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1985
Principal Product REFINING GASKETS
NAICS
n/a
SIC 3053: Gaskets, Packing, and Sealing Devices
Sales Range $1
M
to 5
M
# of Employees 35
Plant Area
n/a
Annual Production 0
units
Production Hrs. Annual 0
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $13,513 219,226
kWh
Natural Gas $3,409 686
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $1,679 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $1,652

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7261: Install timers and/or thermostats $257 $360 - $257
-
MMBtu
02 2.7142: Utilize higher efficiency lamps and/or ballasts $80 $138 $80
1,465
kWh
-
03 2.7142: Utilize higher efficiency lamps and/or ballasts $720 $200 $720
13,775
kWh
-
04 2.7142: Utilize higher efficiency lamps and/or ballasts $61 - $61
1,172
kWh
-
05 2.6121: Reduce hot water temperature to the minimum required $110 - $110
2,052
kWh
-
06 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $258 $139 $258
4,982
kWh
-
07 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $83 $78 $83
1,465
kWh
-
08 2.6232: Install set-back timers $83 $45 $83
1,465
kWh
-
09 2.4221: Install compressor air intakes in coolest locations $27 $190 $27
586
kWh
-
TOTAL RECOMMENDED $1,679 $1,150 $1,422
26,962
kWh
$257
-
MMBtu
TOTAL IMPLEMENTED $1,652 $960 $1,395
26,376
kWh
$257
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs