| Assessment Year | 1983 |
|---|---|
| Principal Product | PRINTED CATALOGS |
| NAICS |
n/a
|
| SIC | 2759: Commercial Printing, Not Elsewhere Classified |
| Sales Range | $10 M to 50M |
| # of Employees | 225 |
| Plant Area |
n/a
|
| Annual Production | 17,000,000
pieces
|
| Production Hrs. Annual | 6,240
hrs
|
| Location (State) | Oklahoma |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $282,297 | 7,745,604 |
kWh
|
$0.036 |
| Natural Gas | $190,095 | 62,137 |
MMBtu
|
$3.06 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $22,940 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $13,516 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|
| 01 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $3,791 | $60 |
$3,791
121,630
kWh
|
- | |
| 02 | 2.4221: Install compressor air intakes in coolest locations | $297 | $392 |
$297
8,206
kWh
|
- | |
| 03 | 2.7261: Install timers and/or thermostats | $163 | $475 |
$163
4,396
kWh
|
- | |
| 04 | 2.7261: Install timers and/or thermostats | $197 | $475 | - |
$197
-
MMBtu
|
|
| 05 | 2.6232: Install set-back timers | $4,660 | $14,963 |
$4,660
119,871
kWh
|
- | |
| 06 | 2.7231: Use radiant heater for spot heating | $3,156 | $1,000 | - |
$3,156
-
MMBtu
|
|
| 07 | 2.3212: Optimize plant power factor | $1,612 | $2,173 |
$1,612
-
kWh
|
- | |
| 08 | 2.2414: Use waste heat from hot flue gases to preheat | $9,064 | $53,000 | - |
$9,064
-
MMBtu
|
|
| TOTAL RECOMMENDED | $22,940 | $72,538 |
$10,523
254,103
kWh
|
$12,417
-
MMBtu
|
||
| TOTAL IMPLEMENTED | $13,516 | $18,588 |
$10,360
249,707
kWh
|
$3,156
-
MMBtu
|
||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs