ITAC Assessment: ND0347
ITAC logo
ITAC Assessment: ND0347
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2000
Principal Product Automotive Seating
NAICS
n/a
SIC 3714: Motor Vehicle Parts and Accessories
Sales Range $10
M
to 50
M
# of Employees 250
Plant Area 83,000
ft2
Annual Production 193,000
pieces
Production Hrs. Annual 4,250
hrs
Location (State) Indiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $33,528 2,035,170
kWh
Electricity Demand $54,119 5,290
kW-mo/yr
Electricity Fees $3,567 -
Natural Gas $10,754 1,969
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $17,043 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $14,483

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $125 $100 $125
7,620
kWh
- -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $2,121 $6,762 $663
40,152
kWh
$1,458
-
kW-mo/yr
-
03 2.1311: Replace electrically-operated equipment with fossil fuel equipment $13,997 $11,000 $5,453
330,891
kWh
$15,506
-
kW-mo/yr
$(-6,962.0)
-
MMBtu
04 2.7442: Keep doors and windows shut when not on use $115 - $115
6,448
kWh
- -
05 2.4151: Develop a repair/replace policy $360 $843 $131
7,913
kWh
$229
-
kW-mo/yr
-
06 2.2211: Use optimum temperature $10 $8 $10
586
kWh
- -
07 2.4221: Install compressor air intakes in coolest locations $236 $900 $126
7,620
kWh
$110
-
kW-mo/yr
-
08 2.1311: Replace electrically-operated equipment with fossil fuel equipment $79 $340 $110
4,982
kWh
$82
-
kW-mo/yr
$(-113.0)
-
MMBtu
TOTAL RECOMMENDED $17,043 $19,953 $6,733
406,212
kWh
$17,385
-
kW-mo/yr
$(-7,075.0)
-
MMBtu
TOTAL IMPLEMENTED $14,483 $12,008 $5,829
353,165
kWh
$15,616
-
kW-mo/yr
$(-6,962.0)
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings