Assessment Year | 2015 |
---|---|
Principal Product | Military countermeasures |
NAICS | 314999: All Other Miscellaneous Textile Product Mills |
SIC | 3999: Manufacturing Industries, Not Elsewhere Classified |
Sales Range | $10 M to 50M |
# of Employees | 43 |
Plant Area |
134,000
ft2
|
Annual Production | 120,000
pieces
|
Production Hrs. Annual | 2,000
hrs
|
Location (State) | North Carolina |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $297,859 | 5,635,000 |
kWh
|
$0.053 |
Electricity Demand | $96,592 | 11,319 |
kW-mo/yr
|
$8.53 |
Natural Gas | $26,174 | 3,015 |
MMBtu
|
$8.68 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $23,569 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $7,121 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,964 | $9,077 |
$1,007
19,040
kWh
|
$974
-
kW-mo/yr
|
- | - | $(-17.0) | |
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,084 | $1,846 |
$508
9,606
kWh
|
$491
-
kW-mo/yr
|
- | - | $85 | |
03 | 2.7135: Install occupancy sensors | $667 | $2,297 |
$667
12,617
kWh
|
- | - | - | - | |
04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,151 | $320 |
$452
8,550
kWh
|
$100
-
kW-mo/yr
|
- | - | $599 | |
05 | 2.7111: Reduce illumination to minimum necessary levels | $214 | $188 |
$102
1,920
kWh
|
$98
-
kW-mo/yr
|
- | - | $14 | |
06 | 2.3132: Recharge batteries on during off-peak demand periods | $917 | $200 |
$542
-
kWh
|
$375
-
kW-mo/yr
|
- | - | - | |
07 | 2.4151: Develop a repair/replace policy | $1,766 | $8,146 |
$898
16,972
kWh
|
$868
-
kW-mo/yr
|
- | - | - | |
08 | 2.2437: Recover waste heat from equipment | $1,917 | $100 |
$1,571
29,696
kWh
|
$346
-
kW-mo/yr
|
- | - | - | |
09 | 2.2437: Recover waste heat from equipment | $1,975 | $1,750 | - | - |
$1,975
-
MMBtu
|
- | - | |
10 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $598 | $100 |
$621
11,738
kWh
|
$137
-
kW-mo/yr
|
- | $(-100.0) | $(-60.0) | |
11 | 2.2437: Recover waste heat from equipment | $2,512 | $8,000 |
$(-278.0)
(-5,256)
kWh
|
$(-61.0)
-
kW-mo/yr
|
$2,851
-
MMBtu
|
- | - | |
12 | 2.7447: Install vinyl strip / high speed / air curtain doors | $161 | $100 | - | - |
$161
-
MMBtu
|
- | - | |
13 | 2.7261: Install timers and/or thermostats | $8,643 | $1,000 |
$8,643
163,390
kWh
|
- | - | - | - | |
TOTAL RECOMMENDED | $23,569 | $33,124 |
$14,733
268,273
kWh
|
$3,328
-
kW-mo/yr
|
$4,987
-
MMBtu
|
$(-100.0) | $621 | ||
TOTAL IMPLEMENTED | $7,121 | $13,324 |
$3,866
73,091
kWh
|
$1,457
-
kW-mo/yr
|
$1,975
-
MMBtu
|
$(-100.0) | $(-77.0) | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | Ancillary Material Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs