ITAC Assessment: NC0535
ITAC logo
ITAC Assessment: NC0535
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2015
Principal Product Military countermeasures
NAICS 314999: All Other Miscellaneous Textile Product Mills
SIC 3999: Manufacturing Industries, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 43
Plant Area 134,000
ft2
Annual Production 120,000
pieces
Production Hrs. Annual 2,000
hrs
Location (State) North Carolina

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $297,859 5,635,000
kWh
Electricity Demand $96,592 11,319
kW-mo/yr
Natural Gas $26,174 3,015
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $23,569 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $7,121

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Ancillary Material Cost Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $1,964 $9,077 $1,007
19,040
kWh
$974
-
kW-mo/yr
- - $(-17.0)
02 2.7142: Utilize higher efficiency lamps and/or ballasts $1,084 $1,846 $508
9,606
kWh
$491
-
kW-mo/yr
- - $85
03 2.7135: Install occupancy sensors $667 $2,297 $667
12,617
kWh
- - - -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $1,151 $320 $452
8,550
kWh
$100
-
kW-mo/yr
- - $599
05 2.7111: Reduce illumination to minimum necessary levels $214 $188 $102
1,920
kWh
$98
-
kW-mo/yr
- - $14
06 2.3132: Recharge batteries on during off-peak demand periods $917 $200 $542
-
kWh
$375
-
kW-mo/yr
- - -
07 2.4151: Develop a repair/replace policy $1,766 $8,146 $898
16,972
kWh
$868
-
kW-mo/yr
- - -
08 2.2437: Recover waste heat from equipment $1,917 $100 $1,571
29,696
kWh
$346
-
kW-mo/yr
- - -
09 2.2437: Recover waste heat from equipment $1,975 $1,750 - - $1,975
-
MMBtu
- -
10 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $598 $100 $621
11,738
kWh
$137
-
kW-mo/yr
- $(-100.0) $(-60.0)
11 2.2437: Recover waste heat from equipment $2,512 $8,000 $(-278.0)
(-5,256)
kWh
$(-61.0)
-
kW-mo/yr
$2,851
-
MMBtu
- -
12 2.7447: Install vinyl strip / high speed / air curtain doors $161 $100 - - $161
-
MMBtu
- -
13 2.7261: Install timers and/or thermostats $8,643 $1,000 $8,643
163,390
kWh
- - - -
TOTAL RECOMMENDED $23,569 $33,124 $14,733
268,273
kWh
$3,328
-
kW-mo/yr
$4,987
-
MMBtu
$(-100.0) $621
TOTAL IMPLEMENTED $7,121 $13,324 $3,866
73,091
kWh
$1,457
-
kW-mo/yr
$1,975
-
MMBtu
$(-100.0) $(-77.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs