Assessment Year | 2008 |
---|---|
Principal Product | Fibercement siding |
NAICS | 327390: Other Concrete Product Manufacturing |
SIC | 3272: Concrete Products, Except Block and Brick |
Sales Range | $10 M to 50M |
# of Employees | 100 |
Plant Area |
220,000
ft2
|
Annual Production | 30,000
thousand feet
|
Production Hrs. Annual | 8,760
hrs
|
Location (State) | North Carolina |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $427,840 | 14,296,800 |
kWh
|
$0.030 |
Electricity Demand | $224,399 | 23,143 |
kW-mo/yr
|
$9.70 |
Electricity Fees | $19,567 | - |
|
- |
Natural Gas | $1,118,700 | 125,373 |
MMBtu
|
$8.92 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $173,699 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $85,223 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.8114: Change rate schedules or other changes in utility service | $12,423 | $15,000 |
$8,549
285,920
kWh
|
$3,874
-
kW-mo/yr
|
- | - | - | |
02 | 2.1133: Adjust burners for efficient operation | $44,894 | $1,000 | - | - |
$44,894
-
MMBtu
|
- | - | |
03 | 2.2414: Use waste heat from hot flue gases to preheat | $32,459 | $75,000 | - | - |
$32,459
-
MMBtu
|
- | - | |
04 | 2.2127: Flash condensate to produce lower pressure steam | $42,026 | $7,815 | - | - |
$42,026
-
MMBtu
|
- | - | |
05 | 2.4226: Use / purchase optimum sized compressor | $21,163 | $50 |
$15,297
511,595
kWh
|
$5,866
-
kW-mo/yr
|
- | - | - | |
06 | 2.2437: Recover waste heat from equipment | $12,635 | $3,500 | - | - |
$12,635
-
MMBtu
|
- | - | |
07 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $400 | $100 |
$1,026
34,322
kWh
|
$394
-
kW-mo/yr
|
- | $(-720.0) | $(-300.0) | |
08 | 2.4151: Develop a repair/replace policy | $4,903 | $7,820 |
$3,525
117,883
kWh
|
$1,378
-
kW-mo/yr
|
- | - | - | |
09 | 2.7134: Use photocell controls | $2,567 | $1,900 |
$1,453
48,600
kWh
|
$1,114
-
kW-mo/yr
|
- | - | - | |
10 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $229 | $507 |
$165
5,504
kWh
|
$64
-
kW-mo/yr
|
- | - | - | |
TOTAL RECOMMENDED | $173,699 | $112,692 |
$30,015
1,003,824
kWh
|
$12,690
-
kW-mo/yr
|
$132,014
-
MMBtu
|
$(-720.0) | $(-300.0) | ||
TOTAL IMPLEMENTED | $85,223 | $85,820 |
$6,004
200,805
kWh
|
$2,886
-
kW-mo/yr
|
$77,353
-
MMBtu
|
$(-720.0) | $(-300.0) | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | Ancillary Material Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs