ITAC Assessment: NC0542
ITAC logo
ITAC Assessment: NC0542
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2015
Principal Product Brazed carbide tips
NAICS 333131: Mining Machinery and Equipment Manufacturing
SIC 3532: Mining Machinery and Equipment, Except Oil and Gas Field Machinery and Equipment
Sales Range $10
M
to 50
M
# of Employees 106
Plant Area 57,500
ft2
Annual Production 16,000,000
pieces
Production Hrs. Annual 6,000
hrs
Location (State) Virginia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $138,165 1,983,400
kWh
Electricity Demand $56,288 7,183
kW-mo/yr
Natural Gas $195,756 30,577
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $45,778 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $43,130

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Ancillary Material Cost Savings
01 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $21,174 $20,250 $21,174
302,488
kWh
- - - -
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,264 $200 $1,175
16,785
kWh
$269
-
kW-mo/yr
- $(-120.0) $(-60.0)
03 2.2437: Recover waste heat from equipment $4,263 $3,000 - - $4,263
-
MMBtu
- -
04 2.4239: Eliminate or reduce compressed air usage $209 $230 $209
2,985
kWh
- - - -
05 2.4231: Reduce the pressure of compressed air to the minimum required $1,525 $3,000 $1,247
17,810
kWh
$278
-
kW-mo/yr
- - -
06 2.2522: Isolate hot or cold equipment $5,296 $420 $4,328
61,826
kWh
$968
-
kW-mo/yr
- - -
07 2.5194: Redesign process $2,648 $500 $2,164
30,912
kWh
$484
-
kW-mo/yr
- - -
08 2.2437: Recover waste heat from equipment $1,576 $510 - - $1,576
-
MMBtu
- -
09 2.4151: Develop a repair/replace policy $3,364 $5,865 $2,748
39,257
kWh
$616
-
kW-mo/yr
- - -
10 2.4111: Utilize energy-efficient belts and other improved mechanisms $741 $140 $605
8,645
kWh
$136
-
kW-mo/yr
- - -
11 2.7142: Utilize higher efficiency lamps and/or ballasts $580 $144 $269
3,847
kWh
$42
-
kW-mo/yr
- - $269
12 2.7142: Utilize higher efficiency lamps and/or ballasts $1,925 $8,373 $1,337
19,104
kWh
- - - $588
13 2.7135: Install occupancy sensors $1,213 $500 $1,213
17,334
kWh
- - - -
TOTAL RECOMMENDED $45,778 $43,132 $36,469
520,993
kWh
$2,793
-
kW-mo/yr
$5,839
-
MMBtu
$(-120.0) $797
TOTAL IMPLEMENTED $43,130 $42,632 $34,305
490,081
kWh
$2,309
-
kW-mo/yr
$5,839
-
MMBtu
$(-120.0) $797
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Ancillary Material Cost Savings