| Assessment Year | 1994 |
|---|---|
| Principal Product | Commercial Dishwashers |
| NAICS |
n/a
|
| SIC | 3589: Service Industry Machinery, Not Elsewhere Classified |
| Sales Range | $10 M to 50M |
| # of Employees | 94 |
| Plant Area |
116,000
ft2
|
| Annual Production | 0
units
|
| Production Hrs. Annual | 2,200
hrs
|
| Location (State) | North Carolina |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $86,920 | 1,112,251 |
kWh
|
$0.078 |
| Natural Gas | $31,588 | 5,435 |
MMBtu
|
$5.81 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $9,239 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | - | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|
| 01 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $368 | $300 |
$368
4,689
kWh
|
- | |
| 02 | 2.4221: Install compressor air intakes in coolest locations | $132 | $420 |
$132
1,758
kWh
|
- | |
| 03 | 2.4231: Reduce the pressure of compressed air to the minimum required | $645 | $1,330 |
$645
8,499
kWh
|
- | |
| 04 | 2.2437: Recover waste heat from equipment | $241 | $530 | - |
$241
-
MMBtu
|
|
| 05 | 2.7313: Recycle air for heating, ventilation and air conditioning | $120 | $250 | - |
$120
-
MMBtu
|
|
| 06 | 2.7243: Improve air circulation with destratification fans / other methods | $2,143 | $9,600 | - |
$2,143
-
MMBtu
|
|
| 07 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $498 | $647 |
$498
6,448
kWh
|
- | |
| 08 | 2.7447: Install vinyl strip / high speed / air curtain doors | $579 | $500 | - |
$579
-
MMBtu
|
|
| 09 | 2.7261: Install timers and/or thermostats | $897 | $500 |
$605
7,913
kWh
|
$292
-
MMBtu
|
|
| 10 | 2.2449: Recover heat from exhausted steam, hot air or hot water | $1,925 | $5,200 | - |
$1,925
-
MMBtu
|
|
| 11 | 2.7424: Shade windows from summer sun | $1,691 | $2,800 |
$1,691
21,981
kWh
|
- | |
| TOTAL RECOMMENDED | $9,239 | $22,077 |
$3,939
51,288
kWh
|
$5,300
-
MMBtu
|
||
| TOTAL IMPLEMENTED | - | - | - | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs