ITAC Assessment: GT0621
ITAC logo
ITAC Assessment: GT0621
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1997
Principal Product Agricultural Implements
NAICS
n/a
SIC 3523: Farm Machinery and Equipment
Sales Range $1
M
to 5
M
# of Employees 25
Plant Area 30,000
ft2
Annual Production 5,000,000
lb
Production Hrs. Annual 2,080
hrs
Location (State) Georgia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $96,847 1,128,664
kWh
Electricity Demand $12,398 6,394
kW-mo/yr
Electricity Fees $12,557 -
Natural Gas $128,251 30,730
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $176,339 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $40,360

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings LPG Savings Other Liquid (non-haz) Savings Personnel Changes Savings Administrative Changes Savings Ancillary Material Cost Savings Primary Product Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,160 $200 $983
11,430
kWh
$130
-
kW-mo/yr
$47 - - - - - - -
02 4.651: Install back-up equipment $124,259 $82,550 - - - - $(-10,530.0)
-
MMBtu
- - - $24,789 $110,000
03 2.4111: Utilize energy-efficient belts and other improved mechanisms $1,020 $1,590 $869
10,258
kWh
$111
-
kW-mo/yr
$40 - - - - - - -
04 2.2514: Cover open tanks $4,950 $5,000 - - - $4,950
-
MMBtu
- - - - - -
05 2.1233: Analyze flue gas for proper air/fuel ratio $38,180 - - - - $35,480
-
MMBtu
- - - $2,700 - -
06 3.4155: Meter waste water $170 - - - - - - - - - $170 -
07 3.3122: Use filtration, centrifuging to remove contaminants $6,600 $6,600 - - - - - $4,800
-
gal
$1,800 - - -
TOTAL RECOMMENDED $176,339 $95,940 $1,852
21,688
kWh
$241
-
kW-mo/yr
$87 $40,430
-
MMBtu
$(-10,530.0)
-
MMBtu
$4,800
-
gal
$1,800 $2,700 $24,959 $110,000
TOTAL IMPLEMENTED $40,360 $1,790 $1,852
21,688
kWh
$241
-
kW-mo/yr
$87 $35,480
-
MMBtu
- - - $2,700 - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings LPG Savings Other Liquid (non-haz) Savings Personnel Changes Savings Administrative Changes Savings Ancillary Material Cost Savings Primary Product Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs