ITAC Assessment: MS0021
ITAC logo
ITAC Assessment: MS0021
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1995
Principal Product Staples,Nails,Full Cells
NAICS
n/a
SIC 3315: Steel Wiredrawing and Steel Nails and Spikes
Sales Range $10
M
to 50
M
# of Employees 150
Plant Area 150,000
ft2
Annual Production 20,958,572
pieces
Production Hrs. Annual 6,000
hrs
Location (State) Mississippi

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $346,428 6,223,623
kWh
Natural Gas $48,667 7,043
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $49,324 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings LPG Savings
01 2.3212: Optimize plant power factor $22,852 $26,750 $22,852
-
kWh
- -
02 2.4133: Use most efficient type of electric motors $2,588 $4,300 $2,588
28,429
kWh
- -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $1,130 $1,936 $1,130
12,309
kWh
- -
04 2.1331: Burn a less expensive grade of fuel $17,678 $75,000 - $48,667
-
MMBtu
$(-30,989.0)
-
MMBtu
05 2.7245: Use direct air supply to exhaust hoods $950 $600 $950
11,137
kWh
- -
06 2.7124: Make a practice of turning off lights when not needed $4,126 - $4,126
131,594
kWh
- -
TOTAL RECOMMENDED $49,324 $108,586 $31,646
183,469
kWh
$48,667
-
MMBtu
$(-30,989.0)
-
MMBtu
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings LPG Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs