ITAC Assessment: MZ0210
ITAC logo
ITAC Assessment: MZ0210
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2016
Principal Product bottled beverages
NAICS 312120: Breweries
SIC 3411: Metal Cans
Sales Range $10
M
to 50
M
# of Employees 220
Plant Area 42,000
ft2
Annual Production 15,000,000
pieces
Production Hrs. Annual 6,400
hrs
Location (State) Missouri

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $108,764 1,218,587
kWh
Electricity Demand $10,029 3,190
kW-mo/yr
Natural Gas $70,426 8,003
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $30,636 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $5,958

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings
01 2.7232: Replace existing hvac unit with high efficiency model $4,108 $24,000 $3,802
42,593
kWh
$306
-
kW-mo/yr
- -
02 2.4133: Use most efficient type of electric motors $1,657 $3,500 $1,555
17,420
kWh
$102
-
kW-mo/yr
- -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $647 $525 $606
6,784
kWh
$41
-
kW-mo/yr
- -
04 2.4221: Install compressor air intakes in coolest locations $749 $2,000 $702
7,870
kWh
$47
-
kW-mo/yr
- -
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,903 $1,150 $1,680
18,820
kWh
$223
-
kW-mo/yr
- -
06 2.2511: Insulate bare equipment $1,100 $500 - - $1,100
-
MMBtu
-
07 2.7442: Keep doors and windows shut when not on use $651 $300 - - $651
-
MMBtu
-
08 2.7135: Install occupancy sensors $3,340 $375 $3,340
37,420
kWh
- - -
09 4.512: Condense operation into one building $1,331 $2,500 $1,224
13,714
kWh
$107
-
kW-mo/yr
- -
10 3.5131: Recycle white water $14,525 $5,000 - - - $14,525
-
Tgal
11 2.2511: Insulate bare equipment $625 $850 - - $625
-
MMBtu
-
TOTAL RECOMMENDED $30,636 $40,700 $12,909
144,621
kWh
$826
-
kW-mo/yr
$2,376
-
MMBtu
$14,525
-
Tgal
TOTAL IMPLEMENTED $5,958 $5,975 $3,841
43,024
kWh
$366
-
kW-mo/yr
$1,751
-
MMBtu
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs