Assessment Year | 1996 |
---|---|
Principal Product | Woven polypropylene plastic bags |
NAICS |
n/a
|
SIC | 3089: Plastics Products, Not Elsewhere Classified |
Sales Range | $5 M to 10M |
# of Employees | 50 |
Plant Area |
60,000
ft2
|
Annual Production | 216,000,000
thousand feet
|
Production Hrs. Annual | 7,392
hrs
|
Location (State) | Texas |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $85,088 | 1,631,301 |
kWh
|
$0.052 |
Electricity Demand | $15,416 | 3,738 |
kW-mo/yr
|
$4.12 |
Electricity Fees | $582 | - |
|
- |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $463,240 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $67,250 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Water Disposal Savings | Solid Waste (non-haz) Savings | Personnel Changes Savings | Primary Product Savings |
---|---|---|---|---|---|---|---|---|---|---|---|
01 | 4.321: Optimize production lot sizes and inventories | $351,900 | $70,000 |
$(-16,000.0)
(-693,142)
kWh
|
$(-20,200.0)
-
kW-mo/yr
|
- | - | - | $(-73,900.0) | $462,000 | |
02 | 3.5212: Regrind, reuse, or sell scrap plastic parts | $34,050 | $30,000 | - | - | - | - |
$34,050
-
lb
|
- | - | |
03 | 3.4154: Eliminate leaks in water lines and valves | $28,650 | $180 | - | - | - |
$28,650
-
Tgal
|
- | - | - | |
04 | 2.3212: Optimize plant power factor | $22,800 | $25,000 | - |
$22,800
-
kW-mo/yr
|
- | - | - | - | - | |
05 | 2.8114: Change rate schedules or other changes in utility service | $18,300 | - | - | - | $18,300 | - | - | - | - | |
06 | 2.6218: Turn off equipment when not in use | $2,420 | $4,410 |
$1,410
61,254
kWh
|
$1,010
-
kW-mo/yr
|
- | - | - | - | - | |
07 | 3.4155: Meter waste water | $1,600 | $2,500 | - | - | - |
$1,600
-
Tgal
|
- | - | - | |
08 | 2.2511: Insulate bare equipment | $1,250 | $50 |
$1,250
54,513
kWh
|
- | - | - | - | - | - | |
09 | 2.2511: Insulate bare equipment | $880 | $50 |
$880
38,394
kWh
|
- | - | - | - | - | - | |
10 | 2.2511: Insulate bare equipment | $860 | $860 |
$860
37,515
kWh
|
- | - | - | - | - | - | |
11 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $530 | $120 |
$180
7,913
kWh
|
$350
-
kW-mo/yr
|
- | - | - | - | - | |
TOTAL RECOMMENDED | $463,240 | $133,170 |
$(-11,420.0)
(-493,553)
kWh
|
$3,960
-
kW-mo/yr
|
$18,300 |
$30,250
-
Tgal
|
$34,050
-
lb
|
$(-73,900.0) | $462,000 | ||
TOTAL IMPLEMENTED | $67,250 | $37,210 |
$1,590
69,167
kWh
|
$1,360
-
kW-mo/yr
|
- |
$30,250
-
Tgal
|
$34,050
-
lb
|
- | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Water Disposal Savings | Solid Waste (non-haz) Savings | Personnel Changes Savings | Primary Product Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs