ITAC Assessment: UD0273
ITAC logo
ITAC Assessment: UD0273
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1988
Principal Product NEWSPAPER INSERTS
NAICS
n/a
SIC 2711: Newspapers: Publishing, or Publishing and Printing
Sales Range $10
M
to 50
M
# of Employees 245
Plant Area
n/a
Annual Production 9,000,000,000
pieces
Production Hrs. Annual 8,400
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $298,445 6,177,609
kWh
Natural Gas $142,310 35,121
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $19,286 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $14,177

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.6221: Use most efficient equipment at it's maximum capacity and less efficient equipment only when necessary $3,249 $300 $3,481
88,511
kWh
$(-232.0)
-
MMBtu
-
02 2.3131: Reschedule plant operations or reduce load to avoid peaks $1,466 - $3,066
-
kWh
- $(-1,600.0)
03 2.2437: Recover waste heat from equipment $799 $500 $799
36,342
kWh
- -
04 2.3511: Use plant owned transformers or lease transformers $10,928 $28,000 $13,428
-
kWh
- $(-2,500.0)
05 2.7142: Utilize higher efficiency lamps and/or ballasts $2,844 $15,120 $2,870
70,633
kWh
$(-626.0)
-
MMBtu
$600
TOTAL RECOMMENDED $19,286 $43,920 $23,644
195,486
kWh
$(-858.0)
-
MMBtu
$(-3,500.0)
TOTAL IMPLEMENTED $14,177 $28,300 $16,909
88,511
kWh
$(-232.0)
-
MMBtu
$(-2,500.0)
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs