ITAC Assessment: MO0215
ITAC logo
ITAC Assessment: MO0215
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1997
Principal Product Aluminum Die Castings
NAICS
n/a
SIC 3363: Aluminum Die-Castings
Sales Range $10
M
to 50
M
# of Employees 270
Plant Area 120,000
ft2
Annual Production 13,000,000
lb
Production Hrs. Annual 6,000
hrs
Location (State) Missouri

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $501,377 8,766,120
kWh
Electricity Demand $45,252 1,838
kW-mo/yr
Electricity Fees $96,254 -
Natural Gas $267,743 69,150
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $87,638 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $65,799

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings Ancillary Material Cost Savings
01 4.711: Initiate a total quality management program $9,696 $25,000 - - - $9,696
02 4.432: Cross-train personnel to avoid lost time $13,144 $25,000 - - - $13,144
03 4.611: Begin a practice of predictive / preventative maintenance $22,956 $5,500 - - - $22,956
04 4.514: Re-arrange equipment layout to reduce handling costs $6,000 $12,500 - - - $6,000
05 2.7142: Utilize higher efficiency lamps and/or ballasts $4,620 $7,432 $4,246
62,427
kWh
$374
-
kW-mo/yr
- -
06 2.7142: Utilize higher efficiency lamps and/or ballasts $664 $1,360 $563
8,206
kWh
$101
-
kW-mo/yr
- -
07 2.7142: Utilize higher efficiency lamps and/or ballasts $189 $276 $182
2,638
kWh
$7
-
kW-mo/yr
- -
08 2.4221: Install compressor air intakes in coolest locations $7,398 $185 $7,105
104,338
kWh
$293
-
kW-mo/yr
- -
09 2.4133: Use most efficient type of electric motors $2,426 $3,383 $2,268
33,411
kWh
$158
-
kW-mo/yr
- -
10 3.6193: Install equipment (eg compactor) to reduce disposal costs $2,695 $5,200 - - $2,695
-
lb
-
11 3.5241: Sell used plates to an aluminum recycler $17,850 - - - $17,850
-
lb
-
TOTAL RECOMMENDED $87,638 $85,836 $14,364
211,020
kWh
$933
-
kW-mo/yr
$20,545
-
lb
$51,796
TOTAL IMPLEMENTED $65,799 $43,136 $14,364
211,020
kWh
$933
-
kW-mo/yr
$17,850
-
lb
$32,652
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs