ITAC Assessment: AS0364
ITAC logo
ITAC Assessment: AS0364
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2003
Principal Product Wood Moulding
NAICS 321918: Other Millwork (including Flooring)
SIC 2431: Millwork
Sales Range $5
M
to 10
M
# of Employees 50
Plant Area
n/a
Annual Production 14,688
thousand feet
Production Hrs. Annual 2,134
hrs
Location (State) Arizona

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $94,269 1,084,700
kWh
Electricity Demand $10,887 6,696
kW-mo/yr
Electricity Fees $7,065 -
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $12,134 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Ancillary Material Cost Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $1,347 $7,928 $852
11,737
kWh
$338
-
kW-mo/yr
$157
02 2.4133: Use most efficient type of electric motors $221 $524 $168
2,313
kWh
$53
-
kW-mo/yr
-
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $990 $150 $725
9,974
kWh
$265
-
kW-mo/yr
-
04 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $9,291 $31,527 $7,053
97,144
kWh
$2,238
-
kW-mo/yr
-
05 2.7314: Reduce ventilation air $285 $10 $204
2,809
kWh
$81
-
kW-mo/yr
-
TOTAL RECOMMENDED $12,134 $40,139 $9,002
123,977
kWh
$2,975
-
kW-mo/yr
$157
TOTAL IMPLEMENTED - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs