| Assessment Year | 2026 |
|---|---|
| Principal Product | Recyclables |
| NAICS | 562212: Solid Waste Landfill |
| SIC | 5331: Variety Stores |
| Sales Range | $1 M to 5M |
| # of Employees | 40 |
| Plant Area |
74,000
ft2
|
| Annual Production | 5,500,000
lb
|
| Production Hrs. Annual | 2,444
hrs
|
| Location (State) | Michigan |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | ||
|---|---|---|---|---|---|
| Electricity Usage | $27,205 | 400,180 |
kWh
|
$0.068 | |
| Natural Gas | $27,015 | 5,231 |
MMBtu
|
$5.16 | |
| Waste Disposal Costs | |||||
| Water Usage | $48,841 | 5,809 |
Tgal
|
$8.41 | |
| TOTAL YEARLY COSTS | $103,061 | ||||
| RECOMMENDED SAVINGS* | $25,481 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
| IMPLEMENTED SAVINGS* | - | ||||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|
| 01 | 2.7261: Install timers and/or thermostats | $9,797 | $969 | - |
$9,797
-
MMBtu
|
|
| 02 | 2.7447: Install vinyl strip / high speed / air curtain doors | $7,361 | $19,925 |
$(-630.0)
(-9,269)
kWh
|
$7,991
-
MMBtu
|
|
| 03 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $298 | $1,592 |
$298
4,387
kWh
|
- | |
| 04 | 2.6231: Utilize controls to operate equipment only when needed | $219 | - |
$219
3,216
kWh
|
- | |
| 05 | 2.7111: Reduce illumination to minimum necessary levels | $171 | - |
$171
2,508
kWh
|
- | |
| 06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $42 | $165 |
$42
623
kWh
|
- | |
| 07 | 2.7314: Reduce ventilation air | $1,988 | - |
$1,988
29,229
kWh
|
- | |
| 08 | 2.7446: Utilize sensors controlling roof and wall openings | $4,966 | $1,875 | - |
$4,966
-
MMBtu
|
|
| 09 | 3.7311: Maintain machines to reduce leaks | $639 | $19 |
$95
1,403
kWh
|
$544
-
MMBtu
|
|
| TOTAL RECOMMENDED | $25,481 | $24,545 |
$2,183
32,097
kWh
|
$23,298
-
MMBtu
|
||
| TOTAL IMPLEMENTED | - | - | - | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs