ITAC Assessment: MUCM41
ITAC logo
ITAC Assessment: MUCM41
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2026
Principal Product Recyclables
NAICS 562212: Solid Waste Landfill
SIC 5331: Variety Stores
Sales Range $1
M
to 5
M
# of Employees 40
Plant Area 74,000
ft2
Annual Production 5,500,000
lb
Production Hrs. Annual 2,444
hrs
Location (State) Michigan

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $27,205 400,180
kWh
Natural Gas $27,015 5,231
MMBtu
Waste Disposal Costs
Water Usage $48,841 5,809
Tgal
TOTAL YEARLY COSTS $103,061
RECOMMENDED SAVINGS* $25,481 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7261: Install timers and/or thermostats $9,797 $969 - $9,797
-
MMBtu
02 2.7447: Install vinyl strip / high speed / air curtain doors $7,361 $19,925 $(-630.0)
(-9,269)
kWh
$7,991
-
MMBtu
03 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $298 $1,592 $298
4,387
kWh
-
04 2.6231: Utilize controls to operate equipment only when needed $219 - $219
3,216
kWh
-
05 2.7111: Reduce illumination to minimum necessary levels $171 - $171
2,508
kWh
-
06 2.7142: Utilize higher efficiency lamps and/or ballasts $42 $165 $42
623
kWh
-
07 2.7314: Reduce ventilation air $1,988 - $1,988
29,229
kWh
-
08 2.7446: Utilize sensors controlling roof and wall openings $4,966 $1,875 - $4,966
-
MMBtu
09 3.7311: Maintain machines to reduce leaks $639 $19 $95
1,403
kWh
$544
-
MMBtu
TOTAL RECOMMENDED $25,481 $24,545 $2,183
32,097
kWh
$23,298
-
MMBtu
TOTAL IMPLEMENTED - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs