Assessment Year | 2003 |
---|---|
Principal Product | PET containers |
NAICS | 326160: Plastics Bottle Manufacturing |
SIC | 3085: Plastics Bottles |
Sales Range | $50 M to 100M |
# of Employees | 26 |
Plant Area |
215,000
ft2
|
Annual Production | 808,000,000
pieces
|
Production Hrs. Annual | 8,712
hrs
|
Location (State) | New Hampshire |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $1,904,613 | 26,085,221 |
kWh
|
$0.073 |
Electricity Demand | $310,166 | 44,726 |
kW-mo/yr
|
$6.93 |
Electricity Fees | $12,064 | - |
|
- |
Natural Gas | $17,044 | 2,028 |
MMBtu
|
$8.40 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $81,911 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $4,979 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | Primary Raw Material Savings | One-time Revenue or Avoided Cost Savings |
---|---|---|---|---|---|---|---|---|---|---|
01 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $28,705 | $21,900 | n/a |
$24,131
357,500
kWh
|
$4,574
-
kW-mo/yr
|
- | - | - | - |
02 | 2.2612: Use cooling tower water instead of refrigeration | $26,717 | $40,000 |
$26,717
395,800
kWh
|
- | - | - | - | - | |
03 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $12,265 | - | - |
$8,413
-
kW-mo/yr
|
- | $3,120 | - | $732 | |
04 | 2.2623: Minimize condenser cooling water temperature | $5,292 | - |
$5,292
78,400
kWh
|
- | - | - | - | - | |
05 | 2.3132: Recharge batteries on during off-peak demand periods | $3,953 | $12,400 | - |
$3,250
-
kW-mo/yr
|
- | - | $703 | - | |
06 | 2.7243: Improve air circulation with destratification fans / other methods | $3,571 | $12,104 |
$(-1,067.0)
(-15,800)
kWh
|
$(-132.0)
-
kW-mo/yr
|
$4,770
-
MMBtu
|
- | - | - | |
07 | 2.7224: Reduce space conditioning during non-working hours | $1,408 | $527 |
$470
7,200
kWh
|
- |
$938
-
MMBtu
|
- | - | - | |
TOTAL RECOMMENDED | $81,911 | $86,931 |
$55,543
823,100
kWh
|
$16,105
-
kW-mo/yr
|
$5,708
-
MMBtu
|
$3,120 | $703 | $732 | ||
TOTAL IMPLEMENTED | $4,979 | $12,631 |
$(-597.0)
(-8,600)
kWh
|
$(-132.0)
-
kW-mo/yr
|
$5,708
-
MMBtu
|
- | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | Primary Raw Material Savings | One-time Revenue or Avoided Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs