Assessment Year | 2014 |
---|---|
Principal Product | Cooked Frozen Meat |
NAICS | 311615: Poultry Processing |
SIC | 2015: Poultry Slaughtering and Processing |
Sales Range | $5 M to 10M |
# of Employees | 175 |
Plant Area |
39,000
ft2
|
Annual Production | 13,500,000
lb
|
Production Hrs. Annual | 8,760
hrs
|
Location (State) | Idaho |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $96,292 | 1,791,083 |
kWh
|
$0.054 |
Electricity Demand | $18,758 | 3,677 |
kW-mo/yr
|
$5.10 |
Electricity Fees | $585 | - |
|
- |
Natural Gas | $146,655 | 28,559 |
MMBtu
|
$5.14 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $6,662 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $4,096 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Disposal Savings | Water Consumption Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.7135: Install occupancy sensors | $353 | $214 |
$353
6,581
kWh
|
- | - | - | - | |
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $680 | $1,366 |
$601
11,172
kWh
|
$79
-
kW-mo/yr
|
- | - | - | |
03 | 2.4221: Install compressor air intakes in coolest locations | $454 | $241 |
$401
7,467
kWh
|
$52
-
kW-mo/yr
|
- | - | - | |
04 | 2.2511: Insulate bare equipment | $2,566 | $2,809 | - | - |
$2,566
-
MMBtu
|
- | - | |
05 | 2.7252: Utilize an evaporative air pre-cooler or other heat exchanger in ac system | $1,992 | $4,512 |
$1,992
37,054
kWh
|
- | - | - | - | |
06 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $81 | $87 |
$57
1,060
kWh
|
$24
-
kW-mo/yr
|
- | - | - | |
07 | 3.4151: Minimize water usage | $535 | $114 | - | - |
$143
-
MMBtu
|
$264
-
Tgal
|
$128
-
Tgal
|
|
TOTAL RECOMMENDED | $6,662 | $9,343 |
$3,404
63,334
kWh
|
$156
-
kW-mo/yr
|
$2,709
-
MMBtu
|
$264
-
Tgal
|
$128
-
Tgal
|
||
TOTAL IMPLEMENTED | $4,096 | $6,534 |
$3,404
63,334
kWh
|
$156
-
kW-mo/yr
|
$143
-
MMBtu
|
$264
-
Tgal
|
$128
-
Tgal
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Disposal Savings | Water Consumption Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs