ITAC Assessment: MU0089
ITAC logo
ITAC Assessment: MU0089
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2026
Principal Product Auto parts assembly
NAICS 336390: Other Motor Vehicle Parts Manufacturing
SIC 3714: Motor Vehicle Parts and Accessories
Sales Range $100
M
to 500
M
# of Employees 156
Plant Area 256,000
ft2
Annual Production 350,000
units
Production Hrs. Annual 6,084
hrs
Location (State) Michigan

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $234,921 2,570,963
kWh
Natural Gas $140,933 24,495
MMBtu
Waste Disposal Costs
Water Usage $6,835 298
Tgal
TOTAL YEARLY COSTS $382,689
RECOMMENDED SAVINGS* $131,717 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings Primary Product Savings
01 2.7447: Install vinyl strip / high speed / air curtain doors $78,892 $102,596 $(-3,210.5)
(-35,280)
kWh
$82,103
-
MMBtu
- -
02 2.8121: Apply for tax-free status for energy purchases $33,832 - - - $33,832 -
03 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $1,763 $6,553 $1,763
19,372
kWh
- - -
04 2.6125: Keep equipment clean $11,720 - $11,720
128,794
kWh
- - -
05 2.6218: Turn off equipment when not in use $118 - $118
1,299
kWh
- - -
06 2.6218: Turn off equipment when not in use $1,224 $30 $644
7,079
kWh
- - $580
07 2.7135: Install occupancy sensors $283 $620 $283
3,113
kWh
- - -
08 2.7142: Utilize higher efficiency lamps and/or ballasts $251 $1,008 $251
2,759
kWh
- - -
09 2.7142: Utilize higher efficiency lamps and/or ballasts $1,174 $3,351 $1,174
12,901
kWh
- - -
10 2.7261: Install timers and/or thermostats $1,758 $69 - $1,758
-
MMBtu
- -
11 2.7423: Reduce heat gain by window tinting $702 $180 $702
7,713
kWh
- - -
TOTAL RECOMMENDED $131,717 $114,407 $13,445
147,749
kWh
$83,860
-
MMBtu
$33,832 $580
TOTAL IMPLEMENTED - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings Primary Product Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs