Assessment Year | 2025 |
---|---|
Principal Product | Metal Stamping Tools |
NAICS | 333514: Special Die and Tool, Die Set, Jig, and Fixture Manufacturing |
SIC | 3354: Aluminum Extruded Products |
Sales Range | $10 M to 50M |
# of Employees | 31 |
Plant Area |
64,000
ft2
|
Annual Production | 20
units
|
Production Hrs. Annual | 2,740
hrs
|
Location (State) | Michigan |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | ||
---|---|---|---|---|---|
Electricity Usage | $23,787 | 637,249 |
kWh
|
$0.037 | |
Electricity Demand | $44,743 | 1,392 |
kW-mo/yr
|
$32.14 | |
Electricity Fees | $16,411 | - |
|
- | |
Natural Gas | $7,058 | 937 |
MMBtu
|
$7.53 | |
LPG | $76,307 | 3,187 |
MMBtu
|
$23.95 | |
Other Gas | $1,127 | 1 |
MMBtu
|
$1,127.48 | |
Waste Disposal Costs | |||||
Water Usage | $1,453 | 231 |
Tgal
|
$6.29 | |
TOTAL YEARLY COSTS | $170,886 | ||||
RECOMMENDED SAVINGS* | $102,096 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | LPG Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.1321: Replace fossil fuel equipment with electrical equipment | $73,104 | $121,444 |
$(-1,371.4)
(-37,066)
kWh
|
$(-1,832.2)
-
kW-mo/yr
|
- |
$76,307
-
MMBtu
|
|
02 | 2.4221: Install compressor air intakes in coolest locations | $9,526 | $9,755 |
$1,902
51,394
kWh
|
$7,624
-
kW-mo/yr
|
- | - | |
03 | 2.4156: Establish a preventative maintenance program | $829 | $473 |
$71
1,915
kWh
|
$270
-
kW-mo/yr
|
$488
-
MMBtu
|
- | |
04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $972 | $26 |
$202
5,466
kWh
|
$770
-
kW-mo/yr
|
- | - | |
05 | 2.4322: Use or replace with energy efficient substitutes | $585 | $3,626 |
$267
7,206
kWh
|
$318
-
kW-mo/yr
|
- | - | |
06 | 2.6211: Conserve energy by efficient use of vending machines | $529 | - |
$241
6,526
kWh
|
$287
-
kW-mo/yr
|
- | - | |
07 | 2.6212: Turn off equipment during breaks, reduce operating time | $1,415 | - |
$105
2,841
kWh
|
$1,310
-
kW-mo/yr
|
- | - | |
08 | 2.7135: Install occupancy sensors | $1,137 | $2,018 |
$228
6,153
kWh
|
$910
-
kW-mo/yr
|
- | - | |
09 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $393 | - |
$116
3,145
kWh
|
$276
-
kW-mo/yr
|
- | - | |
10 | 2.7232: Replace existing hvac unit with high efficiency model | $6,486 | $80,718 |
$495
13,362
kWh
|
$4,680
-
kW-mo/yr
|
$1,311
-
MMBtu
|
- | |
11 | 2.7444: Close holes and openings in building such as broken windows | $31 | $57 |
$3
85
kWh
|
$3
-
kW-mo/yr
|
$24
-
MMBtu
|
- | |
12 | 2.7493: Use double or triple glazed windows to maintain higher relative humidity and to reduce heat losses | $728 | $22,678 | - | - |
$728
-
MMBtu
|
- | |
13 | 2.9114: Use solar heat to make electricty | $6,362 | $24,413 |
$1,320
35,682
kWh
|
$5,041
-
kW-mo/yr
|
- | - | |
TOTAL RECOMMENDED | $102,096 | $265,208 |
$3,579
96,710
kWh
|
$19,658
-
kW-mo/yr
|
$2,552
-
MMBtu
|
$76,307
-
MMBtu
|
||
TOTAL IMPLEMENTED | - | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | LPG Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs