Assessment Year | 2003 |
---|---|
Principal Product | Conveyors |
NAICS | 333922: Conveyor and Conveying Equipment Manufacturing |
SIC | 3535: Conveyors and Conveying Equipment |
Sales Range | $10 M to 50M |
# of Employees | 203 |
Plant Area |
533,000
ft2
|
Annual Production | 1,600
pieces
|
Production Hrs. Annual | 5,148
hrs
|
Location (State) | Mississippi |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $198,954 | 5,893,200 |
kWh
|
$0.034 |
Electricity Demand | $163,211 | 16,753 |
kW-mo/yr
|
$9.74 |
Electricity Fees | $(-14,639.0) | - |
|
- |
Natural Gas | $223,041 | 36,665 |
MMBtu
|
$6.08 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $118,147 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $27,255 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.2442: Preheat combustion air with waste heat | $47,808 | $4,800 | - | - | - |
$47,808
-
MMBtu
|
- | |
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $21,534 | $37,977 |
$12,286
363,917
kWh
|
$8,930
-
kW-mo/yr
|
$318 | - | - | |
03 | 2.7444: Close holes and openings in building such as broken windows | $18,919 | $2,010 | - | - | - |
$18,919
-
MMBtu
|
- | |
04 | 2.7261: Install timers and/or thermostats | $15,997 | $980 | - | - | - |
$15,997
-
MMBtu
|
- | |
05 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $6,210 | $228 |
$6,118
181,227
kWh
|
- | $92 | - | - | |
06 | 2.7133: Use separate switches on perimeter lighting which may be turned off when natural light is available | $2,995 | $528 |
$1,581
46,848
kWh
|
$1,369
-
kW-mo/yr
|
$45 | - | - | |
07 | 2.7261: Install timers and/or thermostats | $1,855 | $827 |
$1,828
54,137
kWh
|
- | $27 | - | - | |
08 | 2.4221: Install compressor air intakes in coolest locations | $1,629 | $1,062 |
$815
21,134
kWh
|
$790
-
kW-mo/yr
|
$24 | - | - | |
09 | 2.4314: Use synthetic lubricant | $846 | $213 |
$656
19,442
kWh
|
$474
-
kW-mo/yr
|
$17 | - | $(-301.0) | |
10 | 2.7122: Disconnect ballasts | $198 | $180 |
$111
3,278
kWh
|
$84
-
kW-mo/yr
|
$3 | - | - | |
11 | 2.2511: Insulate bare equipment | $156 | $260 | - | - | - |
$156
-
MMBtu
|
- | |
TOTAL RECOMMENDED | $118,147 | $49,065 |
$23,395
689,983
kWh
|
$11,647
-
kW-mo/yr
|
$526 |
$82,880
-
MMBtu
|
$(-301.0) | ||
TOTAL IMPLEMENTED | $27,255 | $2,743 |
$9,638
285,490
kWh
|
$1,453
-
kW-mo/yr
|
$167 |
$15,997
-
MMBtu
|
- | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings | Ancillary Material Cost Savings |