ITAC Assessment: SF0255
ITAC logo
ITAC Assessment: SF0255
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2003
Principal Product Newspaper
NAICS 511110: Newspaper Publishers
SIC 2711: Newspapers: Publishing, or Publishing and Printing
Sales Range $50
M
to 100
M
# of Employees 625
Plant Area 156,000
ft2
Annual Production 0
units
Production Hrs. Annual 3,328
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $185,845 5,065,104
kWh
Electricity Demand $96,904 11,094
kW-mo/yr
Natural Gas $22,528 3,608
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $43,401 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $3,807

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings
01 2.4231: Reduce the pressure of compressed air to the minimum required $1,228 $140 $878
23,919
kWh
$350
-
kW-mo/yr
-
02 2.4239: Eliminate or reduce compressed air usage $9,649 $3,715 $5,192
141,513
kWh
$4,457
-
kW-mo/yr
-
03 2.2612: Use cooling tower water instead of refrigeration $7,212 $5,250 $5,866
159,896
kWh
$1,346
-
kW-mo/yr
-
04 2.4226: Use / purchase optimum sized compressor $2,226 $3,400 $2,226
60,650
kWh
- -
05 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $6,416 $13,464 $3,471
94,607
kWh
$2,945
-
kW-mo/yr
-
06 2.7135: Install occupancy sensors $3,302 $7,220 $1,972
53,761
kWh
$1,330
-
kW-mo/yr
-
07 2.4133: Use most efficient type of electric motors $353 $796 $252
6,871
kWh
$101
-
kW-mo/yr
-
08 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $12,337 $587 $9,295
253,328
kWh
$3,042
-
kW-mo/yr
-
09 2.3212: Optimize plant power factor $678 $1,749 - $215
-
kW-mo/yr
$463
TOTAL RECOMMENDED $43,401 $36,321 $29,152
794,545
kWh
$13,786
-
kW-mo/yr
$463
TOTAL IMPLEMENTED $3,807 $4,336 $3,356
91,440
kWh
$451
-
kW-mo/yr
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs