ITAC Assessment: AM0134
ITAC logo
ITAC Assessment: AM0134
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1991
Principal Product SANFORIZED COTTON
NAICS
n/a
SIC 2211: Broadwoven Fabric Mills, Cotton
Sales Range $50
M
to 100
M
# of Employees 320
Plant Area
n/a
Annual Production 20,600,000
lb
Production Hrs. Annual 6,600
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,320,682 34,415,299
kWh
Natural Gas $444,748 169,927
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $185,847 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Other Energy Savings Administrative Changes Savings
01 2.3192: Use fossil fuel powered generator during peak demand periods $91,770 - $110,470
-
kWh
- $(-18,700.0)
-
MMBtu
-
02 2.4133: Use most efficient type of electric motors $6,677 $7,240 $6,677
172,919
kWh
- - -
03 2.4239: Eliminate or reduce compressed air usage $18,080 $43,900 $18,080
785,463
kWh
- - -
04 2.2443: Re-use or recycle hot or cold process exhaust air $29,000 $114,000 - $29,000
-
MMBtu
- -
05 2.2612: Use cooling tower water instead of refrigeration $14,690 - $14,690
410,317
kWh
- - -
06 2.7142: Utilize higher efficiency lamps and/or ballasts $10,610 - $12,400
320,926
kWh
- - $(-1,790.0)
07 2.3131: Reschedule plant operations or reduce load to avoid peaks $11,610 - $11,610
-
kWh
- - -
08 2.7142: Utilize higher efficiency lamps and/or ballasts $3,410 $3,820 $3,410
88,511
kWh
- - -
TOTAL RECOMMENDED $185,847 $168,960 $177,337
1,778,136
kWh
$29,000
-
MMBtu
$(-18,700.0)
-
MMBtu
$(-1,790.0)
TOTAL IMPLEMENTED - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Other Energy Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs