Assessment Year | 1991 |
---|---|
Principal Product | SANFORIZED COTTON |
NAICS |
n/a
|
SIC | 2211: Broadwoven Fabric Mills, Cotton |
Sales Range | $50 M to 100M |
# of Employees | 320 |
Plant Area |
n/a
|
Annual Production | 20,600,000
lb
|
Production Hrs. Annual | 6,600
hrs
|
Location (State) | Texas |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $1,320,682 | 34,415,299 |
kWh
|
$0.038 |
Natural Gas | $444,748 | 169,927 |
MMBtu
|
$2.62 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $185,847 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Other Energy Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.3192: Use fossil fuel powered generator during peak demand periods | $91,770 | - |
$110,470
-
kWh
|
- |
$(-18,700.0)
-
MMBtu
|
- | |
02 | 2.4133: Use most efficient type of electric motors | $6,677 | $7,240 |
$6,677
172,919
kWh
|
- | - | - | |
03 | 2.4239: Eliminate or reduce compressed air usage | $18,080 | $43,900 |
$18,080
785,463
kWh
|
- | - | - | |
04 | 2.2443: Re-use or recycle hot or cold process exhaust air | $29,000 | $114,000 | - |
$29,000
-
MMBtu
|
- | - | |
05 | 2.2612: Use cooling tower water instead of refrigeration | $14,690 | - |
$14,690
410,317
kWh
|
- | - | - | |
06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $10,610 | - |
$12,400
320,926
kWh
|
- | - | $(-1,790.0) | |
07 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $11,610 | - |
$11,610
-
kWh
|
- | - | - | |
08 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $3,410 | $3,820 |
$3,410
88,511
kWh
|
- | - | - | |
TOTAL RECOMMENDED | $185,847 | $168,960 |
$177,337
1,778,136
kWh
|
$29,000
-
MMBtu
|
$(-18,700.0)
-
MMBtu
|
$(-1,790.0) | ||
TOTAL IMPLEMENTED | - | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Other Energy Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs