Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2001
Principal Product Electric blankets
NAICS
n/a
SIC 2299: Textile goods, Not Elsewhere Classified
Sales Range $100
M
to 500
M
# of Employees 620
Plant Area 893,000
ft2
Annual Production 2,400,000
pieces
Production Hrs. Annual 6,000
hrs
Location (State) Mississippi

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $138,612 13,194,000
kWh
Electricity Demand $183,265 36,653
kW-mo/yr
Electricity Fees $325,007 -
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $28,180 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $7,267

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Water Disposal Savings
01 2.4221: Install compressor air intakes in coolest locations $262 $489 $187
6,294
kWh
$71
-
kW-mo/yr
$4 - -
02 2.3132: Recharge batteries on during off-peak demand periods $4,853 - - $4,781
-
kW-mo/yr
$72 - -
03 2.7122: Disconnect ballasts $2,179 $3,078 $1,553
52,462
kWh
$594
-
kW-mo/yr
$32 - -
04 2.7261: Install timers and/or thermostats $963 $408 - - - $963
-
MMBtu
-
05 2.7261: Install timers and/or thermostats $17,990 $2,183 $17,724
597,669
kWh
- $266 - -
06 2.2511: Insulate bare equipment $87 $10 $86
2,895
kWh
- $1 - -
07 2.2511: Insulate bare equipment $1,611 $98 $512
17,292
kWh
- $8 $1,091
-
MMBtu
-
08 4.821: Pay bills on time to avoid late fees $235 $100 - - - - $235
-
Tgal
TOTAL RECOMMENDED $28,180 $6,366 $20,062
676,612
kWh
$5,446
-
kW-mo/yr
$383 $2,054
-
MMBtu
$235
-
Tgal
TOTAL IMPLEMENTED $7,267 $3,178 $1,553
52,462
kWh
$5,375
-
kW-mo/yr
$104 - $235
-
Tgal
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Water Disposal Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs