ITAC Assessment: KU0229
ITAC logo
ITAC Assessment: KU0229
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1987
Principal Product PAPER CONTAINERS
NAICS
n/a
SIC 2752: Commercial Printing, Lithographic
Sales Range $10
M
to 50
M
# of Employees 275
Plant Area
n/a
Annual Production 200,000
pieces
Production Hrs. Annual 6,240
hrs
Location (State) Missouri

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $270,388 3,890,094
kWh
Natural Gas $10,764 2,861
MMBtu
Other Energy $96,372 11,238
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $15,902 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $7,646

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $5,296 $6,510 $5,296
76,202
kWh
-
02 2.7261: Install timers and/or thermostats $1,678 $8,000 $937
13,482
kWh
$741
-
MMBtu
03 2.2437: Recover waste heat from equipment $2,410 $2,100 - $2,410
-
MMBtu
04 2.4221: Install compressor air intakes in coolest locations $3,157 $1,260 $3,157
45,428
kWh
-
05 2.4312: Improve lubrication practices $2,689 - $2,689
38,687
kWh
-
06 2.4111: Utilize energy-efficient belts and other improved mechanisms $672 - $672
9,672
kWh
-
TOTAL RECOMMENDED $15,902 $17,870 $12,751
183,471
kWh
$3,151
-
MMBtu
TOTAL IMPLEMENTED $7,646 $14,510 $6,905
99,356
kWh
$741
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs