ITAC Assessment: MO0116
ITAC logo
ITAC Assessment: MO0116
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1994
Principal Product walnut shells, kernels, animal feed
NAICS
n/a
SIC 2068: Salted and Roasted Nuts and Seeds
Sales Range $5
M
to 10
M
# of Employees 164
Plant Area
n/a
Annual Production 18,600,000
lb
Production Hrs. Annual 6,552
hrs
Location (State) Missouri

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $62,330 1,189,918
kWh
Natural Gas $61,924 13,767
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $13,712 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $4,841

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Water Disposal Savings Administrative Changes Savings
01 2.6231: Utilize controls to operate equipment only when needed $4,244 $1,500 - $1,014
-
MMBtu
$3,230
-
Tgal
-
02 2.1233: Analyze flue gas for proper air/fuel ratio $460 $995 - $460
-
MMBtu
- -
03 2.4133: Use most efficient type of electric motors $2,271 $4,863 $2,271
43,376
kWh
- - -
04 2.4111: Utilize energy-efficient belts and other improved mechanisms $1,781 $565 $1,781
33,998
kWh
- - -
05 2.8113: Purchase gas directly from a contract gas supplier $3,411 $5,300 - - - $3,411
06 2.7142: Utilize higher efficiency lamps and/or ballasts $969 $7,255 $969
18,464
kWh
- - -
07 2.7142: Utilize higher efficiency lamps and/or ballasts $439 $285 $439
8,499
kWh
- - -
08 2.4221: Install compressor air intakes in coolest locations $137 $207 $137
2,638
kWh
- - -
TOTAL RECOMMENDED $13,712 $20,970 $5,597
106,975
kWh
$1,474
-
MMBtu
$3,230
-
Tgal
$3,411
TOTAL IMPLEMENTED $4,841 $2,702 $137
2,638
kWh
$1,474
-
MMBtu
$3,230
-
Tgal
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Water Disposal Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs