| Assessment Year | 2026 |
|---|---|
| Principal Product | Soy-based Protein |
| NAICS | 311119: Other Animal Food Manufacturing |
| SIC | 2048: Prepared Feed and Feed Ingredients for Animals and Fowls, Except Dogs and Cats |
| Sales Range | $50 M to 100M |
| # of Employees | 60 |
| Plant Area |
42,000
ft2
|
| Annual Production | 30,000
ton
|
| Production Hrs. Annual | 8,184
hrs
|
| Location (State) | South Dakota |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | ||
|---|---|---|---|---|---|
| Electricity Usage | $594,857 | 10,900,000 |
kWh
|
$0.055 | |
| Electricity Fees | $30,112 | - |
|
- | |
| Natural Gas | $1,843,961 | 271,210 |
MMBtu
|
$6.80 | |
| Waste Disposal Costs | |||||
| Water Usage | $146,106 | 56,635 |
Tgal
|
$2.58 | |
| TOTAL YEARLY COSTS | $2,615,036 | ||||
| RECOMMENDED SAVINGS* | $3,902,698 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
| IMPLEMENTED SAVINGS* | - | ||||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Personnel Changes Savings | Ancillary Material Cost Savings | Primary Product Savings |
|---|---|---|---|---|---|---|---|---|---|
| 01 | 2.8211: Consolidate freight shipments and/or deliveries | $1,437,264 | $600,000 | - | - | $233,829 | $1,203,435 | - | |
| 02 | 4.114: Add/modify equipment to improve drying process | $900,000 | $1,200,000 | - | - | - | - | $900,000 | |
| 03 | 2.5123: Reduce fluid flow rates | $862,950 | $672,300 | - |
$862,950
-
MMBtu
|
- | - | - | |
| 04 | 3.7123: Use continuous processing | $515,427 | $123,656 | - |
$11,427
-
MMBtu
|
- | - | $504,000 | |
| 05 | 2.2414: Use waste heat from hot flue gases to preheat | $184,176 | $1,561,000 | - |
$189,176
-
MMBtu
|
$(-5,000.0) | - | - | |
| 06 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $2,881 | $3,000 |
$3,221
58,572
kWh
|
- | $(-240.0) | $(-100.0) | - | |
| TOTAL RECOMMENDED | $3,902,698 | $4,159,956 |
$3,221
58,572
kWh
|
$1,063,553
-
MMBtu
|
$228,589 | $1,203,335 | $1,404,000 | ||
| TOTAL IMPLEMENTED | - | - | - | - | - | - | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Personnel Changes Savings | Ancillary Material Cost Savings | Primary Product Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs