ITAC Assessment: ME0191
ITAC logo
ITAC Assessment: ME0191
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1996
Principal Product STEEL PRODUCTS
NAICS
n/a
SIC 3441: Fabricated Structural Metal
Sales Range $5
M
to 10
M
# of Employees 100
Plant Area 30,000
ft2
Annual Production 1,500
pieces
Production Hrs. Annual 4,992
hrs
Location (State) Maine

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $86,560 822,392
kWh
Electricity Demand $25,131 3,042
kW-mo/yr
Natural Gas $17,298 2,780
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $17,679 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $13,531

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings
01 2.4324: Replace hydraulic / pneumatic equipment with electric equipment $4,148 $4,800 $4,148
59,496
kWh
- - -
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,679 $600 $2,679
38,101
kWh
- - -
03 2.1311: Replace electrically-operated equipment with fossil fuel equipment $2,670 $1,070 $2,863
41,032
kWh
$892
-
kW-mo/yr
$(-1,085.0)
-
MMBtu
-
04 2.2437: Recover waste heat from equipment $2,594 $1,530 - - $2,594
-
MMBtu
-
05 2.7261: Install timers and/or thermostats $1,984 $2,400 - - $1,984
-
MMBtu
-
06 2.7142: Utilize higher efficiency lamps and/or ballasts $1,191 $4,542 $860
12,309
kWh
$331
-
kW-mo/yr
- -
07 2.7447: Install vinyl strip / high speed / air curtain doors $848 $200 - - $848
-
MMBtu
-
08 2.4221: Install compressor air intakes in coolest locations $783 $1,200 $783
11,137
kWh
- - -
09 3.5315: Lease / purchase baler; sell cardboard to recycler $782 $10,247 - - - $782
-
lb
TOTAL RECOMMENDED $17,679 $26,589 $11,333
162,075
kWh
$1,223
-
kW-mo/yr
$4,341
-
MMBtu
$782
-
lb
TOTAL IMPLEMENTED $13,531 $21,789 $7,185
102,579
kWh
$1,223
-
kW-mo/yr
$4,341
-
MMBtu
$782
-
lb
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs