Assessment Year | 2007 |
---|---|
Principal Product | Copper wire |
NAICS | 331420: Copper Rolling, Drawing, Extruding, and Alloying |
SIC | 3357: Drawing and Insulating of Nonferrous Wire |
Sales Range | $50 M to 100M |
# of Employees | 160 |
Plant Area |
324,594
ft2
|
Annual Production | 4,800
ton
|
Production Hrs. Annual | 8,760
hrs
|
Location (State) | New Hampshire |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $2,017,195 | 16,553,128 |
kWh
|
$0.12 |
Electricity Demand | $213,960 | 29,906 |
kW-mo/yr
|
$7.15 |
Electricity Fees | $2,190 | - |
|
- |
LPG | $8,717 | 581 |
MMBtu
|
$15.00 |
Fuel Oil #2 | $58,374 | 3,921 |
MMBtu
|
$14.89 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $189,690 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $69,676 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | LPG Savings | Fuel Oil #2 Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $84,828 | $100,250 |
$144,277
1,182,600
kWh
|
$23,166
-
kW-mo/yr
|
$(-82,615.0)
-
MMBtu
|
- | |
02 | 2.2447: Heat water with exhaust heat | $25,021 | $44,540 |
$(-339.0)
(-3,268)
kWh
|
- | - |
$25,360
-
MMBtu
|
|
03 | 4.652: Replace existing equipment with more suitable substitutes | $23,390 | $85,000 |
$21,374
175,200
kWh
|
$2,016
-
kW-mo/yr
|
- | - | |
04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $19,535 | $24,820 |
$17,848
146,300
kWh
|
$1,687
-
kW-mo/yr
|
- | - | |
05 | 2.7261: Install timers and/or thermostats | $9,514 | $1,776 | - | - | - |
$9,514
-
MMBtu
|
|
06 | 2.7243: Improve air circulation with destratification fans / other methods | $8,532 | $8,100 |
$(-855.0)
(-7,008)
kWh
|
$(-79.0)
-
kW-mo/yr
|
- |
$9,466
-
MMBtu
|
|
07 | 2.7231: Use radiant heater for spot heating | $7,012 | $10,990 | - | - |
$(-6,856.0)
-
MMBtu
|
$13,868
-
MMBtu
|
|
08 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $4,784 | $20,175 |
$9,618
78,840
kWh
|
$1,030
-
kW-mo/yr
|
$(-5,864.0)
-
MMBtu
|
- | |
09 | 2.4221: Install compressor air intakes in coolest locations | $1,751 | $3,025 |
$1,601
13,127
kWh
|
$150
-
kW-mo/yr
|
- | - | |
10 | 2.7447: Install vinyl strip / high speed / air curtain doors | $5,323 | $6,022 |
$(-99.0)
(-808)
kWh
|
- | - |
$5,422
-
MMBtu
|
|
TOTAL RECOMMENDED | $189,690 | $304,698 |
$193,425
1,584,983
kWh
|
$27,970
-
kW-mo/yr
|
$(-95,335.0)
-
MMBtu
|
$63,630
-
MMBtu
|
||
TOTAL IMPLEMENTED | $69,676 | $88,283 |
$18,156
148,343
kWh
|
$1,758
-
kW-mo/yr
|
- |
$49,762
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | LPG Savings | Fuel Oil #2 Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs