ITAC Assessment: SD0581
ITAC logo
ITAC Assessment: SD0581
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2019
Principal Product Electronics
NAICS 334419: Other Electronic Component Manufacturing
SIC 3679: Electronic Components, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 90
Plant Area 41,700
ft2
Annual Production 23,000
units
Production Hrs. Annual 3,120
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $49,784 507,186
kWh
Electricity Demand $44,814 2,298
kW-mo/yr
Electricity Fees $2,748 -
TOTAL YEARLY COSTS $97,346
RECOMMENDED SAVINGS* $47,633 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $47,633

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings One-time Revenue or Avoided Cost Savings
01 2.7425: Clean or color roof to reduce solar load $17,801 $49,815 $14,798
150,689
kWh
$3,003
-
kW-mo/yr
-
02 2.7232: Replace existing hvac unit with high efficiency model $22,240 $45,000 $13,801
140,571
kWh
$8,439
-
kW-mo/yr
-
03 2.7142: Utilize higher efficiency lamps and/or ballasts $5,432 $6,261 $2,779
28,310
kWh
$2,584
-
kW-mo/yr
$69
04 2.7134: Use photocell controls $1,448 $2,880 $1,448
14,749
kWh
- -
05 2.7135: Install occupancy sensors $712 $2,580 $712
7,253
kWh
- -
TOTAL RECOMMENDED $47,633 $106,536 $33,538
341,572
kWh
$14,026
-
kW-mo/yr
$69
TOTAL IMPLEMENTED $47,633 $106,536 $33,538
341,572
kWh
$14,026
-
kW-mo/yr
$69
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs