Assessment Year | 1996 |
---|---|
Principal Product | military vehicle sensory equipment |
NAICS |
n/a
|
SIC | 3679: Electronic Components, Not Elsewhere Classified |
Sales Range | $10 M to 50M |
# of Employees | 175 |
Plant Area |
70,000
ft2
|
Annual Production | 22,000
pieces
|
Production Hrs. Annual | 2,125
hrs
|
Location (State) | New Hampshire |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $90,291 | 1,028,722 |
kWh
|
$0.088 |
Electricity Demand | $21,568 | 2,891 |
kW-mo/yr
|
$7.46 |
Fuel Oil #2 | $6,000 | 1,225 |
MMBtu
|
$4.90 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $28,928 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $15,368 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Fuel Oil #2 Savings | Other Liquid (non-haz) Savings | Solid Waste (non-haz) Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.6232: Install set-back timers | $4,082 | - | - | - |
$4,082
-
MMBtu
|
- | - | |
02 | 3.6193: Install equipment (eg compactor) to reduce disposal costs | $4,520 | $2,700 | - | - | - |
$4,520
-
gal
|
- | |
03 | 3.5315: Lease / purchase baler; sell cardboard to recycler | $3,840 | $2,200 | - | - | - | - |
$3,840
-
lb
|
|
04 | 2.7264: Interlock heating and air conditioning systems to prevent simultaneous operation | $5,576 | $24,000 |
$4,863
55,686
kWh
|
$713
-
kW-mo/yr
|
- | - | - | |
05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $9,888 | $52,000 |
$6,710
76,495
kWh
|
$3,178
-
kW-mo/yr
|
- | - | - | |
06 | 3.5217: Reuse / recycle/ sell paper products | $960 | $79 | - | - | - | - |
$960
-
lb
|
|
07 | 2.4221: Install compressor air intakes in coolest locations | $62 | $102 |
$62
586
kWh
|
- | - | - | - | |
TOTAL RECOMMENDED | $28,928 | $81,081 |
$11,635
132,767
kWh
|
$3,891
-
kW-mo/yr
|
$4,082
-
MMBtu
|
$4,520
-
gal
|
$4,800
-
lb
|
||
TOTAL IMPLEMENTED | $15,368 | $54,779 |
$6,710
76,495
kWh
|
$3,178
-
kW-mo/yr
|
- |
$4,520
-
gal
|
$960
-
lb
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Fuel Oil #2 Savings | Other Liquid (non-haz) Savings | Solid Waste (non-haz) Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs