| Assessment Year | 1992 |
|---|---|
| Principal Product | METAL FINISHINGS |
| NAICS |
n/a
|
| SIC | 3471: Electroplating, Plating, Polishing, Anodizing, and Coloring |
| Sales Range | $1 M to 5M |
| # of Employees | 44 |
| Plant Area |
n/a
|
| Annual Production | 10,000
pieces
|
| Production Hrs. Annual | 2,185
hrs
|
| Location (State) | Connecticut |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $52,641 | 363,423 |
kWh
|
$0.14 |
| Natural Gas | $133,203 | 20,025 |
MMBtu
|
$6.65 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $31,775 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $26,136 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.8114: Change rate schedules or other changes in utility service | $10,389 | - | - |
$10,389
-
MMBtu
|
- | |
| 02 | 2.7229: Air condition only space necessary | $10,704 | $1,000 |
$849
5,862
kWh
|
$9,855
-
MMBtu
|
- | |
| 03 | 2.7492: Use proper thickness of insulation on building envelope | $5,095 | $15,537 | - |
$5,095
-
MMBtu
|
- | |
| 04 | 2.7261: Install timers and/or thermostats | $3,392 | - | - |
$3,392
-
MMBtu
|
- | |
| 05 | 2.7447: Install vinyl strip / high speed / air curtain doors | $1,071 | $1,368 | - |
$1,071
-
MMBtu
|
- | |
| 06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $580 | $1 |
$614
4,396
kWh
|
- | $(-34.0) | |
| 07 | 2.4221: Install compressor air intakes in coolest locations | $298 | $54 |
$298
2,052
kWh
|
- | - | |
| 08 | 2.7493: Use double or triple glazed windows to maintain higher relative humidity and to reduce heat losses | $246 | $3,870 | - |
$246
-
MMBtu
|
- | |
| TOTAL RECOMMENDED | $31,775 | $21,830 |
$1,761
12,310
kWh
|
$30,048
-
MMBtu
|
$(-34.0) | ||
| TOTAL IMPLEMENTED | $26,136 | $2,369 |
$1,463
10,258
kWh
|
$24,707
-
MMBtu
|
$(-34.0) | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs