ITAC Assessment: MA0260
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1992
Principal Product METAL FINISHINGS
NAICS
n/a
SIC 3471: Electroplating, Plating, Polishing, Anodizing, and Coloring
Sales Range $1
M
to 5
M
# of Employees 44
Plant Area
n/a
Annual Production 10,000
pieces
Production Hrs. Annual 2,185
hrs
Location (State) Connecticut

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $52,641 363,423
kWh
Natural Gas $133,203 20,025
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $31,775 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $26,136

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.8114: Change rate schedules or other changes in utility service $10,389 - - $10,389
-
MMBtu
-
02 2.7229: Air condition only space necessary $10,704 $1,000 $849
5,862
kWh
$9,855
-
MMBtu
-
03 2.7492: Use proper thickness of insulation on building envelope $5,095 $15,537 - $5,095
-
MMBtu
-
04 2.7261: Install timers and/or thermostats $3,392 - - $3,392
-
MMBtu
-
05 2.7447: Install vinyl strip / high speed / air curtain doors $1,071 $1,368 - $1,071
-
MMBtu
-
06 2.7142: Utilize higher efficiency lamps and/or ballasts $580 $1 $614
4,396
kWh
- $(-34.0)
07 2.4221: Install compressor air intakes in coolest locations $298 $54 $298
2,052
kWh
- -
08 2.7493: Use double or triple glazed windows to maintain higher relative humidity and to reduce heat losses $246 $3,870 - $246
-
MMBtu
-
TOTAL RECOMMENDED $31,775 $21,830 $1,761
12,310
kWh
$30,048
-
MMBtu
$(-34.0)
TOTAL IMPLEMENTED $26,136 $2,369 $1,463
10,258
kWh
$24,707
-
MMBtu
$(-34.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs