ITAC Assessment: MA0216
ITAC logo
ITAC Assessment: MA0216
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1991
Principal Product LITHOGRAPH PLATES/ROLLS
NAICS
n/a
SIC 2796: Platemaking and Related Services
Sales Range $10
M
to 50
M
# of Employees 91
Plant Area
n/a
Annual Production 38,500
thousand feet
Production Hrs. Annual 6,000
hrs
Location (State) Massachusetts

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $549,763 6,750,586
kWh
Natural Gas $225,880 30,110
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $29,196 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $29,196

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.2443: Re-use or recycle hot or cold process exhaust air $9,534 $22,880 $(-3,509.0)
(-43,083)
kWh
$13,043
-
MMBtu
02 2.3212: Optimize plant power factor $6,750 $23,400 $6,750
-
kWh
-
03 2.7142: Utilize higher efficiency lamps and/or ballasts $6,673 $8,000 $6,673
82,943
kWh
-
04 2.7261: Install timers and/or thermostats $3,188 $3,548 - $3,188
-
MMBtu
05 2.4133: Use most efficient type of electric motors $307 $1,189 $307
3,810
kWh
-
06 2.2437: Recover waste heat from equipment $1,800 $590 - $1,800
-
MMBtu
07 2.4221: Install compressor air intakes in coolest locations $472 $193 $472
5,862
kWh
-
08 2.6232: Install set-back timers $472 $398 $472
5,862
kWh
-
TOTAL RECOMMENDED $29,196 $60,198 $11,165
55,394
kWh
$18,031
-
MMBtu
TOTAL IMPLEMENTED $29,196 $60,198 $11,165
55,394
kWh
$18,031
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs