ITAC Assessment: MA0176
ITAC logo
ITAC Assessment: MA0176
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1990
Principal Product PLASTIC BUBBLE SHEETS
NAICS
n/a
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $5
M
to 10
M
# of Employees 46
Plant Area
n/a
Annual Production 2,500,000
lb
Production Hrs. Annual 7,488
hrs
Location (State) Massachusetts

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $198,944 2,409,144
kWh
Natural Gas $24,294 4,174
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $8,696 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $4,662

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7261: Install timers and/or thermostats $444 $1,000 $237
2,931
kWh
$207
-
MMBtu
02 2.4221: Install compressor air intakes in coolest locations $1,404 $2,000 $1,404
16,999
kWh
-
03 2.7226: Use computer programs to optimize hvac performance $1,258 $3,500 $1,258
15,240
kWh
-
04 2.7142: Utilize higher efficiency lamps and/or ballasts $799 $101 $799
9,672
kWh
-
05 2.2437: Recover waste heat from equipment $2,776 $2,000 - $2,776
-
MMBtu
06 2.7245: Use direct air supply to exhaust hoods $1,909 $2,000 - $1,909
-
MMBtu
07 2.6232: Install set-back timers $106 $200 $106
1,172
kWh
-
TOTAL RECOMMENDED $8,696 $10,801 $3,804
46,014
kWh
$4,892
-
MMBtu
TOTAL IMPLEMENTED $4,662 $5,301 $2,546
30,774
kWh
$2,116
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs