Assessment Year | 1990 |
---|---|
Principal Product | PLASTIC BUBBLE SHEETS |
NAICS |
n/a
|
SIC | 3089: Plastics Products, Not Elsewhere Classified |
Sales Range | $5 M to 10M |
# of Employees | 46 |
Plant Area |
n/a
|
Annual Production | 2,500,000
lb
|
Production Hrs. Annual | 7,488
hrs
|
Location (State) | Massachusetts |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $198,944 | 2,409,144 |
kWh
|
$0.083 |
Natural Gas | $24,294 | 4,174 |
MMBtu
|
$5.82 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $8,696 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $4,662 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
---|---|---|---|---|---|---|
01 | 2.7261: Install timers and/or thermostats | $444 | $1,000 |
$237
2,931
kWh
|
$207
-
MMBtu
|
|
02 | 2.4221: Install compressor air intakes in coolest locations | $1,404 | $2,000 |
$1,404
16,999
kWh
|
- | |
03 | 2.7226: Use computer programs to optimize hvac performance | $1,258 | $3,500 |
$1,258
15,240
kWh
|
- | |
04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $799 | $101 |
$799
9,672
kWh
|
- | |
05 | 2.2437: Recover waste heat from equipment | $2,776 | $2,000 | - |
$2,776
-
MMBtu
|
|
06 | 2.7245: Use direct air supply to exhaust hoods | $1,909 | $2,000 | - |
$1,909
-
MMBtu
|
|
07 | 2.6232: Install set-back timers | $106 | $200 |
$106
1,172
kWh
|
- | |
TOTAL RECOMMENDED | $8,696 | $10,801 |
$3,804
46,014
kWh
|
$4,892
-
MMBtu
|
||
TOTAL IMPLEMENTED | $4,662 | $5,301 |
$2,546
30,774
kWh
|
$2,116
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs