| Assessment Year | 1992 |
|---|---|
| Principal Product | Steel Tanks/Fabricated Steel Prod. |
| NAICS |
n/a
|
| SIC | 3443: Fabricated Plate Work (Boiler Shops) |
| Sales Range | $5 M to 10M |
| # of Employees | 50 |
| Plant Area |
92,600
ft2
|
| Annual Production | 2,000,000
lb
|
| Production Hrs. Annual | 3,016
hrs
|
| Location (State) | Colorado |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $88,516 | 1,067,995 |
kWh
|
$0.083 |
| Natural Gas | $34,988 | 9,281 |
MMBtu
|
$3.77 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $34,106 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $32,590 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings | Primary Raw Material Savings |
|---|---|---|---|---|---|---|---|---|
| 01 | 2.8114: Change rate schedules or other changes in utility service | $1,100 | $250 | - | - | $1,100 | - | |
| 02 | 2.6212: Turn off equipment during breaks, reduce operating time | $820 | $5 | - |
$820
-
MMBtu
|
- | - | |
| 03 | 2.7224: Reduce space conditioning during non-working hours | $1,120 | $1,300 | - |
$1,120
-
MMBtu
|
- | - | |
| 04 | 2.7261: Install timers and/or thermostats | $190 | $10 | - |
$190
-
MMBtu
|
- | - | |
| 05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $28,500 | $29,730 |
$28,500
343,787
kWh
|
- | - | - | |
| 06 | 2.7111: Reduce illumination to minimum necessary levels | $190 | $10 |
$190
2,345
kWh
|
- | - | - | |
| 07 | 2.6212: Turn off equipment during breaks, reduce operating time | $360 | $310 |
$360
14,654
kWh
|
- | - | - | |
| 08 | 3.1121: Use more efficient adhesive applicators | $1,516 | $1,700 | - | - | - | $1,516 | |
| 09 | 2.7252: Utilize an evaporative air pre-cooler or other heat exchanger in ac system | $310 | $1,500 |
$310
12,016
kWh
|
- | - | - | |
| TOTAL RECOMMENDED | $34,106 | $34,815 |
$29,360
372,802
kWh
|
$2,130
-
MMBtu
|
$1,100 | $1,516 | ||
| TOTAL IMPLEMENTED | $32,590 | $33,115 |
$29,360
372,802
kWh
|
$2,130
-
MMBtu
|
$1,100 | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings | Primary Raw Material Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs