ITAC Assessment: CO0246
ITAC logo
ITAC Assessment: CO0246
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1992
Principal Product Steel Tanks/Fabricated Steel Prod.
NAICS
n/a
SIC 3443: Fabricated Plate Work (Boiler Shops)
Sales Range $5
M
to 10
M
# of Employees 50
Plant Area 92,600
ft2
Annual Production 2,000,000
lb
Production Hrs. Annual 3,016
hrs
Location (State) Colorado

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $88,516 1,067,995
kWh
Natural Gas $34,988 9,281
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $34,106 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $32,590

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings Primary Raw Material Savings
01 2.8114: Change rate schedules or other changes in utility service $1,100 $250 - - $1,100 -
02 2.6212: Turn off equipment during breaks, reduce operating time $820 $5 - $820
-
MMBtu
- -
03 2.7224: Reduce space conditioning during non-working hours $1,120 $1,300 - $1,120
-
MMBtu
- -
04 2.7261: Install timers and/or thermostats $190 $10 - $190
-
MMBtu
- -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $28,500 $29,730 $28,500
343,787
kWh
- - -
06 2.7111: Reduce illumination to minimum necessary levels $190 $10 $190
2,345
kWh
- - -
07 2.6212: Turn off equipment during breaks, reduce operating time $360 $310 $360
14,654
kWh
- - -
08 3.1121: Use more efficient adhesive applicators $1,516 $1,700 - - - $1,516
09 2.7252: Utilize an evaporative air pre-cooler or other heat exchanger in ac system $310 $1,500 $310
12,016
kWh
- - -
TOTAL RECOMMENDED $34,106 $34,815 $29,360
372,802
kWh
$2,130
-
MMBtu
$1,100 $1,516
TOTAL IMPLEMENTED $32,590 $33,115 $29,360
372,802
kWh
$2,130
-
MMBtu
$1,100 -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings Primary Raw Material Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs