ITAC Assessment: MA0150
ITAC logo
ITAC Assessment: MA0150
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1989
Principal Product HAND TOOL PACKAGES
NAICS
n/a
SIC 3423: Hand and Edge Tools, Except Machine Tools and Handsaws
Sales Range $100
M
to 500
M
# of Employees 235
Plant Area
n/a
Annual Production 1,800,000
pieces
Production Hrs. Annual 4,710
hrs
Location (State) Connecticut

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $115,084 1,649,472
kWh
Natural Gas $49,310 8,079
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $12,767 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $5,652

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.6232: Install set-back timers $5,583 $7,511 $5,583
80,012
kWh
-
02 2.2532: Use only amount of air necessary to prevent explosion hazard $2,258 $3,032 - $2,258
-
MMBtu
03 2.7261: Install timers and/or thermostats $3,394 $2,099 - $3,394
-
MMBtu
04 2.4221: Install compressor air intakes in coolest locations $327 $53 $327
4,689
kWh
-
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,082 $576 $1,082
15,533
kWh
-
06 2.6232: Install set-back timers $123 $146 $123
1,758
kWh
-
TOTAL RECOMMENDED $12,767 $13,417 $7,115
101,992
kWh
$5,652
-
MMBtu
TOTAL IMPLEMENTED $5,652 $5,131 - $5,652
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs