ITAC Assessment: MA0134
ITAC logo
ITAC Assessment: MA0134
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1988
Principal Product HAND OPER. CUTTING IMPL.
NAICS
n/a
SIC 3421: Cutlery
Sales Range $10
M
to 50
M
# of Employees 113
Plant Area
n/a
Annual Production 1,600,000
pieces
Production Hrs. Annual 2,375
hrs
Location (State) Connecticut

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $64,890 830,891
kWh
Fuel Oil #2 $15,868 3,640
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $9,216 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $6,022

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Fuel Oil #2 Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $556 $1,340 $556
7,034
kWh
-
02 2.7261: Install timers and/or thermostats $3,972 $918 - $3,972
-
MMBtu
03 2.4111: Utilize energy-efficient belts and other improved mechanisms $586 - $586
7,620
kWh
-
04 2.7442: Keep doors and windows shut when not on use $1,494 $1,085 - $1,494
-
MMBtu
05 2.4221: Install compressor air intakes in coolest locations $274 $150 $274
3,517
kWh
-
06 2.4322: Use or replace with energy efficient substitutes $2,334 $1,880 - $2,334
-
MMBtu
TOTAL RECOMMENDED $9,216 $5,373 $1,416
18,171
kWh
$7,800
-
MMBtu
TOTAL IMPLEMENTED $6,022 $3,343 $556
7,034
kWh
$5,466
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Fuel Oil #2 Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs