ITAC Assessment: MA0123
ITAC logo
ITAC Assessment: MA0123
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1988
Principal Product HINGES
NAICS
n/a
SIC 3429: Hardware, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 60
Plant Area
n/a
Annual Production 0
units
Production Hrs. Annual 2,772
hrs
Location (State) Connecticut

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $66,951 835,873
kWh
Natural Gas $9,899 1,417
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $10,815 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $8,772

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $366 $139 $366
4,689
kWh
-
02 2.2492: Use "heat wheel" or other heat exchanger to cross-exchange building exhaust air with make-up air $3,548 $21,500 - $3,548
-
MMBtu
03 2.4221: Install compressor air intakes in coolest locations $352 $300 $352
4,396
kWh
-
04 2.7226: Use computer programs to optimize hvac performance $963 $4,800 $963
12,016
kWh
-
05 2.4111: Utilize energy-efficient belts and other improved mechanisms $2,090 - $2,090
26,084
kWh
-
06 2.7447: Install vinyl strip / high speed / air curtain doors $2,768 $229 - $2,768
-
MMBtu
07 2.6232: Install set-back timers $728 $235 $728
9,086
kWh
-
TOTAL RECOMMENDED $10,815 $27,203 $4,499
56,271
kWh
$6,316
-
MMBtu
TOTAL IMPLEMENTED $8,772 $21,868 $2,456
30,773
kWh
$6,316
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs