Assessment Year | 1988 |
---|---|
Principal Product | HINGES |
NAICS |
n/a
|
SIC | 3429: Hardware, Not Elsewhere Classified |
Sales Range | $10 M to 50M |
# of Employees | 60 |
Plant Area |
n/a
|
Annual Production | 0
units
|
Production Hrs. Annual | 2,772
hrs
|
Location (State) | Connecticut |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $66,951 | 835,873 |
kWh
|
$0.080 |
Natural Gas | $9,899 | 1,417 |
MMBtu
|
$6.99 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $10,815 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $8,772 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $366 | $139 |
$366
4,689
kWh
|
- | |
02 | 2.2492: Use "heat wheel" or other heat exchanger to cross-exchange building exhaust air with make-up air | $3,548 | $21,500 | - |
$3,548
-
MMBtu
|
|
03 | 2.4221: Install compressor air intakes in coolest locations | $352 | $300 |
$352
4,396
kWh
|
- | |
04 | 2.7226: Use computer programs to optimize hvac performance | $963 | $4,800 |
$963
12,016
kWh
|
- | |
05 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $2,090 | - |
$2,090
26,084
kWh
|
- | |
06 | 2.7447: Install vinyl strip / high speed / air curtain doors | $2,768 | $229 | - |
$2,768
-
MMBtu
|
|
07 | 2.6232: Install set-back timers | $728 | $235 |
$728
9,086
kWh
|
- | |
TOTAL RECOMMENDED | $10,815 | $27,203 |
$4,499
56,271
kWh
|
$6,316
-
MMBtu
|
||
TOTAL IMPLEMENTED | $8,772 | $21,868 |
$2,456
30,773
kWh
|
$6,316
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs