ITAC Assessment: MA0031
ITAC logo
ITAC Assessment: MA0031
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1985
Principal Product ALUMINUM TOOLS
NAICS
n/a
SIC 3363: Aluminum Die-Castings
Sales Range $1
M
to 5
M
# of Employees 19
Plant Area
n/a
Annual Production 30,000
lb
Production Hrs. Annual 2,600
hrs
Location (State) Massachusetts

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $25,103 291,032
kWh
Natural Gas $4,972 700
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $4,428 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $646

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $376 $45 $376
4,396
kWh
- -
02 2.6232: Install set-back timers $376 $186 $376
4,396
kWh
- -
03 2.4221: Install compressor air intakes in coolest locations $91 $100 $91
1,172
kWh
- -
04 2.1311: Replace electrically-operated equipment with fossil fuel equipment $209 $540 $313
3,517
kWh
$(-104.0)
-
MMBtu
-
05 2.2443: Re-use or recycle hot or cold process exhaust air $3,197 - $(-188.0)
(-2,345)
kWh
$3,272
-
MMBtu
$113
06 2.7261: Install timers and/or thermostats $179 $405 - $179
-
MMBtu
-
TOTAL RECOMMENDED $4,428 $1,276 $968
11,136
kWh
$3,347
-
MMBtu
$113
TOTAL IMPLEMENTED $646 $550 $467
5,568
kWh
$179
-
MMBtu
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs