ITAC Assessment: MA0010
ITAC logo
ITAC Assessment: MA0010
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1984
Principal Product FLUID MILK PRODUCTS
NAICS
n/a
SIC 2024: Ice Cream and Frozen Desserts
Sales Range $10
M
to 50
M
# of Employees 155
Plant Area
n/a
Annual Production 20,300
Tgal
Production Hrs. Annual 5,928
hrs
Location (State) Vermont

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $251,984 4,682,884
kWh
Fuel Oil #2 $8,240 980
MMBtu
Fuel Oil #4 $84,341 14,256
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $36,861 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $20,258

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Fuel Oil #2 Savings Fuel Oil #4 Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $712 $135 $712
13,189
kWh
- -
02 2.4221: Install compressor air intakes in coolest locations $574 $200 $574
10,551
kWh
- -
03 2.7261: Install timers and/or thermostats $4,782 $1,260 $4,782
88,511
kWh
- -
04 2.7447: Install vinyl strip / high speed / air curtain doors $8,400 $6,300 $8,400
156,213
kWh
- -
05 2.1212: Operate boilers on high fire setting $3,110 $4,000 - - $3,110
-
MMBtu
06 2.2447: Heat water with exhaust heat $16,603 $22,000 - - $16,603
-
MMBtu
07 2.7291: Reschedule and rearrange multiple-source heating systems $2,680 $8,130 - $8,245
-
MMBtu
$(-5,565.0)
-
MMBtu
TOTAL RECOMMENDED $36,861 $42,025 $14,468
268,464
kWh
$8,245
-
MMBtu
$14,148
-
MMBtu
TOTAL IMPLEMENTED $20,258 $20,025 $14,468
268,464
kWh
$8,245
-
MMBtu
$(-2,455.0)
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Fuel Oil #2 Savings Fuel Oil #4 Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs