| Assessment Year | 1984 |
|---|---|
| Principal Product | FLUID MILK PRODUCTS |
| NAICS |
n/a
|
| SIC | 2024: Ice Cream and Frozen Desserts |
| Sales Range | $10 M to 50M |
| # of Employees | 155 |
| Plant Area |
n/a
|
| Annual Production | 20,300
Tgal
|
| Production Hrs. Annual | 5,928
hrs
|
| Location (State) | Vermont |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $251,984 | 4,682,884 |
kWh
|
$0.054 |
| Fuel Oil #2 | $8,240 | 980 |
MMBtu
|
$8.41 |
| Fuel Oil #4 | $84,341 | 14,256 |
MMBtu
|
$5.92 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $36,861 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $20,258 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Fuel Oil #2 Savings | Fuel Oil #4 Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $712 | $135 |
$712
13,189
kWh
|
- | - | |
| 02 | 2.4221: Install compressor air intakes in coolest locations | $574 | $200 |
$574
10,551
kWh
|
- | - | |
| 03 | 2.7261: Install timers and/or thermostats | $4,782 | $1,260 |
$4,782
88,511
kWh
|
- | - | |
| 04 | 2.7447: Install vinyl strip / high speed / air curtain doors | $8,400 | $6,300 |
$8,400
156,213
kWh
|
- | - | |
| 05 | 2.1212: Operate boilers on high fire setting | $3,110 | $4,000 | - | - |
$3,110
-
MMBtu
|
|
| 06 | 2.2447: Heat water with exhaust heat | $16,603 | $22,000 | - | - |
$16,603
-
MMBtu
|
|
| 07 | 2.7291: Reschedule and rearrange multiple-source heating systems | $2,680 | $8,130 | - |
$8,245
-
MMBtu
|
$(-5,565.0)
-
MMBtu
|
|
| TOTAL RECOMMENDED | $36,861 | $42,025 |
$14,468
268,464
kWh
|
$8,245
-
MMBtu
|
$14,148
-
MMBtu
|
||
| TOTAL IMPLEMENTED | $20,258 | $20,025 |
$14,468
268,464
kWh
|
$8,245
-
MMBtu
|
$(-2,455.0)
-
MMBtu
|
||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Fuel Oil #2 Savings | Fuel Oil #4 Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs