ITAC Assessment: AS0261
ITAC logo
ITAC Assessment: AS0261
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1999
Principal Product Aircraft Component Parts
NAICS
n/a
SIC 3728: Aircraft Parts and Auxiliary Equipment, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 60
Plant Area 45,000
ft2
Annual Production 60,000
pieces
Production Hrs. Annual 6,120
hrs
Location (State) Arizona

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $105,101 1,767,878
kWh
Electricity Demand $13,757 4,943
kW-mo/yr
Electricity Fees $10,080 -
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $26,552 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $9,651

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings Administrative Changes Savings Ancillary Material Cost Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $6,589 $21,494 $4,640
115,768
kWh
$1,949
-
kW-mo/yr
- - -
02 2.7132: Install timers on light switches in little used areas $1,057 $166 $681
16,999
kWh
$376
-
kW-mo/yr
- - -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $285 $319 $138
3,517
kWh
$41
-
kW-mo/yr
$52 - $54
04 2.7232: Replace existing hvac unit with high efficiency model $12,722 $10,500 $9,179
228,898
kWh
$3,543
-
kW-mo/yr
- - -
05 2.7424: Shade windows from summer sun $1,062 $980 $1,062
26,377
kWh
- - - -
06 2.1311: Replace electrically-operated equipment with fossil fuel equipment $1,852 $3,385 $306
(-6,448)
kWh
$1,546
-
kW-mo/yr
- - -
07 3.6192: Use a less expensive method of waste removal $925 $120 - - - $925 -
08 4.812: Apply for investment incentives $2,060 $60 - - - $2,060 -
TOTAL RECOMMENDED $26,552 $37,024 $16,006
385,111
kWh
$7,455
-
kW-mo/yr
$52 $2,985 $54
TOTAL IMPLEMENTED $9,651 $25,318 $5,084
112,837
kWh
$3,536
-
kW-mo/yr
$52 $925 $54
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings Administrative Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs