ITAC Assessment: UW0032
ITAC logo
ITAC Assessment: UW0032
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2009
Principal Product Sheet Metal Products
NAICS 332999: All Other Miscellaneous Fabricated Metal Product Manufacturing
SIC 3499: Fabricated Metal Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 100
Plant Area 100,000
ft2
Annual Production 50,000
pieces
Production Hrs. Annual 4,420
hrs
Location (State) Washington

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $72,084 1,463,960
kWh
Natural Gas $37,836 2,825
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $26,587 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $17,787

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.2511: Insulate bare equipment $8,800 $7,248 $650
13,009
kWh
- $8,150
-
MMBtu
02 2.4133: Use most efficient type of electric motors $8,782 $31,747 $8,320
178,523
kWh
$462
-
kW-mo/yr
-
03 2.7142: Utilize higher efficiency lamps and/or ballasts $3,643 $10,000 $3,439
73,169
kWh
$204
-
kW-mo/yr
-
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $5,065 $3,070 $4,799
95,986
kWh
$266
-
kW-mo/yr
-
05 2.2531: Re-size charging openings or add movable cover or door $297 $200 - - $297
-
MMBtu
TOTAL RECOMMENDED $26,587 $52,265 $17,208
360,687
kWh
$932
-
kW-mo/yr
$8,447
-
MMBtu
TOTAL IMPLEMENTED $17,787 $45,017 $16,558
347,678
kWh
$932
-
kW-mo/yr
$297
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs