ITAC Assessment: AR0161
ITAC logo
ITAC Assessment: AR0161
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1999
Principal Product Cardboard containers
NAICS
n/a
SIC 2653: Corrugated and Solid Fiber Boxes
Sales Range $10
M
to 50
M
# of Employees 50
Plant Area 167,000
ft2
Annual Production 6,160,435
pieces
Production Hrs. Annual 2,080
hrs
Location (State) Tennessee

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $58,803 1,499,121
kWh
Electricity Demand $35,026 3,851
kW-mo/yr
Natural Gas $18,218 3,262
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $24,364 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $8,080

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Solid Waste (non-haz) Savings Personnel Changes Savings By-product Production Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $8,867 $161 $5,634
61,547
kWh
$3,233
-
kW-mo/yr
- - - - -
02 2.4221: Install compressor air intakes in coolest locations $271 $220 $102
1,758
kWh
$169
-
kW-mo/yr
- - - - -
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,348 $130 $649
16,706
kWh
$699
-
kW-mo/yr
- - - - -
04 2.4133: Use most efficient type of electric motors $149 $377 $61
1,465
kWh
$88
-
kW-mo/yr
- - - - -
05 2.7447: Install vinyl strip / high speed / air curtain doors $4,553 $8,938 - - - $4,553
-
MMBtu
- - -
06 3.5315: Lease / purchase baler; sell cardboard to recycler $1,472 - - - $(-2.0) - $1,474
-
lb
- -
07 3.5311: Recover and reuse waste material $2,864 $6,495 - - - - - - $2,864
08 4.625: Develop standard operating procedures $4,840 $800 $(-47.0)
(-879)
kWh
- - - - $4,887 -
TOTAL RECOMMENDED $24,364 $17,121 $6,399
80,597
kWh
$4,189
-
kW-mo/yr
$(-2.0) $4,553
-
MMBtu
$1,474
-
lb
$4,887 $2,864
TOTAL IMPLEMENTED $8,080 $1,527 $765
19,050
kWh
$956
-
kW-mo/yr
$(-2.0) - $1,474
-
lb
$4,887 -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Solid Waste (non-haz) Savings Personnel Changes Savings By-product Production Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs